Contribute Information
Can you contribute information about this project?
Contact the EWS Team
According to bank provided information, this Phase 1 of a ten-year Multiphase Programmatic Approach combines large investments in transport, sanitation, and urban upgrading with regulatory reforms in urban governance and land, to mobilize private sector investments and create jobs for a more inclusive and competitive Abidjan. It is delivered through five target zones, where these investments and reforms are concentrated and coordinated. Phase 1 is financed through Investment Project Financing and is designed as a platform to attract co-financing.Context: Greater Abidjan generates over 40 percent of national gross domestic product, but congestion costs 1.2 billion US dollars a year, 30 percent of residents live in informal settlements, and no authority governs the metropolitan area.Scope: The operation envisages integrated investments across five strategic zones of Greater Abidjan, combining : (i) climate resilient urban infrastructure, including flood management, drainage and sanitation; (ii) urban mobility, encompassing BRT extensions, multimodal interchange/parking hubs, e-mobility, and active mobility solutions; (iii) strategic connectivity and logistics, including priority road connections, regional corridors such as Abidjan-Lagos, urban logistics facilities and port/industrial areas; (iv) urban upgrading, including improvements to informal settlements, public spaces and green urban infrastructure; and (v) institutional strengthening and policy reforms to enhance metropolitan governance, integrated urban planning, land management and lagoon transport operations.Alignement with CPF, PND, and Greater Abidjan masterplan: This operation is aligned with the Country Partnership Framework for Cote d'Ivoire (FY2023-FY2027), which focuses on improving human capital, reducing disparities and building resilience, and creating private sector jobs as it contributes through flood resilience, affordable and safer mobility, upgrading of informal settlements, and investments and reforms that mobilize private capital and jobs. It also supports the national development plan 2026-2030, notably Pillar 5 on strategic infrastructure and regional economic hubs, ecological transition, climate resilience and circular economy, by enhancing the competitivity and inclusivity of Abidjan as a metropolitan economic hubs. Finally, it also supports the Greater Abidjan Master Plan (SDUGA) 2040, the Government's long-term spatial framework, by translating it into prioritized, coordinated investments in transport, drainage, sanitation and land, and by building the institutions to plan, finance and implement them across the ministries and local authorities.
World Bank
Vivien Deparday
Senior Urban Specialist
Oceane Keou
Senior Transport Specialist
Borrower/Client/Recipient
Ministère des Finances et du Budget
Implementing Agencies
Ministère des Transports et des Affaires Maritimes
Ministère de l’Hydraulique, de l’Assainissement et de la Salubrité
Ministère de l’Urbanisme, du Logement et du Cadre de Vie
Ministère des Infrastructures et de l'Entretien Routier
ACCESS TO INFORMATION
To submit an information request for project information, you will have to create an account to access the Access to Information request form. You can learn more about this process at: https://www.worldbank.org/en/access-to-information/request-submission
ACCOUNTABILITY MECHANISM OF THE WORLD BANK
The World Bank Inspection Panel is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by a World Bank-financed project. If you submit a complaint to the Inspection Panel, they may investigate to assess whether the World Bank is following its own policies and procedures for preventing harm to people or the environment. You can contact the Inspection Panel or submit a complaint by emailing ipanel@worldbank.org. Information on how to file a complaint and a complaint request form are available at: https://www.inspectionpanel.org/how-to-file-complaint