According to the Bank’s website, the objective of this project is to improve the quality of irrigation water services; to strengthen the operational performance of the irrigation operators; and to increase crop yields.
The project will focus on the irrigation sub-sector. It aims at supporting irrigated agriculture in public irrigation schemes, through: (i) strengthened performance of the operator of the irrigation service; (ii) modernized irrigation infrastructure, reducing losses and ensuring more flexible access to water; and (iii) improved agricultural value addition, productivity and market access.
The environmental risk rating is Substantial. The project activities are expected to generate typical construction-related environmental risks such as noise, dust, solid and liquid waste, increased runoff, and soil erosion. The use of heavy machinery, opening of borrow pits or quarries, and potential removal of vegetation or trees may cause site degradation, landscape disturbance, or habitat fragmentation. While these risks are largely predictable and site-specific, the spatial scale of the infrastructure components and their proximity to sensitive areas (watercourses, forested patches, agricultural lands) require systematic environmental screening and careful planning.
Social risks for this project are deemed to be Substantial, particularly given the potential impacts of the project on local communities, including temporary disruption to livelihoods, changes in land access, and the need to manage expectations around project benefits, especially for vulnerable groups among farmers, women and youth. Social risks include: (i) weak social risk management system; (ii) limited institutional capacity to manage social risks through the Environmental and Social Framework (ESF); (iii) poor working conditions, lack of formal contracts, inadequate occupational health and safety (OHS) measures, and the use of child or forced labor, especially among migrant or seasonal workers; (iv) influx of labor, even if limited, can create social tensions with local communities and increase the risk of sexual exploitation and abuse/sexual harassment (SEA/SH).
Total Project Cost: US$ 147.50 million
IBRD Commitment: US$ 124.00 million
CONTACT POINT - World Bank
Task Team Leader: Gabriella Izzi
Title: Senior Irrigation Specialist
Email: gizzi@worldbank.org
TTL Contact: Habab Taifour
Job Title: Lead Water Specialist
Email: htaifour@worldbank.org
TTL Contact: Mampionona Amboarasoa
Job Title: Senior Agriculture Economist
Email: mamboarasoa@worldbank.org
Borrower/Client/Recipient
Ministry of Economy and Planning
Implementing Agencies
Ministère de l’Agriculture, des Ressources Hydrauliques et de la Pêche, MARHP
ACCESS TO INFORMATION
To submit an information request for project information, you will have to create an account to access the Access to Information request form. You can learn more about this process at: https://www.worldbank.org/en/access-to-information/request-submission
ACCOUNTABILITY MECHANISM OF THE WORLD BANK
The World Bank Inspection Panel is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by a World Bank-financed project. If you submit a complaint to the Inspection Panel, they may investigate to assess whether the World Bank is following its own policies and procedures for preventing harm to people or the environment. You can contact the Inspection Panel or submit a complaint by emailing ipanel@worldbank.org. Information on how to file a complaint and a complaint request form are available at: https://www.inspectionpanel.org/how-to-file-complaint