Brazil: Patria Infrastructure Fund V - Co-Investment: OMNIA Data Center (AIIB-E0636C-CI02)

Countries
  • Brazil
Geographic location where the impacts of the investment may be experienced.
Specific Location
Municipality of Pecém
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • Asian Infrastructure Investment Bank (AIIB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Approved
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
B
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Jun 11, 2026
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Patria Investments
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Communications
  • Infrastructure
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 10.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Loan Amount (USD)
$ 10.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Project Cost (USD)
$ 10.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ AIIB website

Updated in EWS Sep 22, 2026


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

OBJECTIVE

To support the development of sustainable digital infrastructure in Brazil and contribute to cross-border connectivity by financing Phase I of OMNIA's first hyperscale data center platform in Pecem, Brazil (the "Project").

DESCRIPTION

OMNIA is a newly launched DC platform by Patria Investments, focused on developing hyperscale, AI-ready, and cloud-optimized DCs. The Project is located in Pecem, Ceara, Brazil, within the Ceara Special Economic Zone that offers tax and regulatory incentives for export-oriented services. The Project will be developed with total gross capacity of 300 megawatt. It will be fully powered by renewable energy through a strategic partnership with Casa dos Ventos, Brazil's largest renewable energy company. The site is strategically located near Fortaleza, a major subsea cable landing hub in Brazil, enabling low-latency international connectivity to global DCs.

ENVIRONMENTAL AND SOCIAL INFORMATION

Applicable Policy and Categorization.
AIIB's Environmental and Social Policy (ESP), including the Environmental and Social Standards (ESSs) and the Environmental and Social Exclusion List (ESEL), apply to the Project. Environmental and Social Standard (ESS) 1, ESS 2 (Land Acquisition and Involuntary Resettlement), and ESS 3 (Indigenous Peoples) apply to the Project. The Project is classified as Category B with high risk due to environmental and social (ES) risks and impacts associated with: (i) critical habitat/biodiversity, (ii) potential influx of workers to the Project area of influence during construction phase, (iii) land acquisition and involuntary resettlement along the transmission line, (iv) indirect impacts to a Quilombola (afro-descendent group), a subset of indigenous people (IP) in Brazil, located within 8 km of the Project's area of influence and (v) contextual and reputational risks associated with legacy issues to IPs living outside of the direct area of influence of the Project.

Environmental and Social Instruments.
The Fund Manager has an Environment and Social Management System (ESMS) aligned with AIIB's ESP and has adopted AIIB's ESEL for screening potential investments. Patria conducts Environmental and Social Due Diligence (ESDD) to identify gaps between Brazil's ES requirements and those in AIIB's ESSs. Patria's ESDD includes an Environmental and Social Action Plan (ESAP) agreed with AIIB, IFC and other investors. The key ES instruments include Patria's ESDD report, an ESAP requiring a series of Environmental and Social Management Plans (ESMPs), including a Critical Habitat Assessment (CHA), a Biodiversity Action Plan, a Stakeholder Engagement Plan (SEP) that includes informed consultation and participation with nearby IP groups, a Grievance Redress Mechanism (GRM) for stakeholders and project workers, among others, bringing the Project into compliance with AIIB's ES Standards.

Environmental and Social Aspects.
The potential environmental risks and impacts identified for the construction phase include: (i) land use change, loss of vegetation and terrestrial habitat due to land clearing, (ii) alteration of natural drainage, (iii) impacts due to generation of effluents and waste, and (iv) disturbance from noise, vibration, dust, and traffic. During operation, the Project is expected to generate e-waste, hazardous waste, and wastewater. These environmental risks and impacts will be addressed through the ESMPs. To address water scarcity and local impacts, the Project will conduct an Ecosystem Services Impact Assessment, perform cumulative impact studies with industrial zone developers, and establish a water monitoring system to track usage and losses during commissioning. To assess the biodiversity impact of the construction of the DCs and its associated transmission line, a CHA has been conducted in accordance with the methodology established in IFC PS6. The study and mitigation measures conclude that it is feasible to achieve "no net loss" for impacts on natural habitats. The impact on biodiversity will be addressed through the implementation of a Biodiversity Management Plan. The primary potential social risks and impacts include existing legacy issues associated with IPs who claim the government did not formally recognize their ancestral lands at the time of creating the Port complex (over two decades back); and stakeholder concerns regarding potential impacts to ecosystem services, primarily water and natural resources. The Project also triggers ESS3 because one Quilombola community exists within an 8 km radius of the Project area of influence, but the Project does not trigger any FPIC on criteria as established in ESS 3. In addition, the Project is tagged as Gender Responsive. OMNIA will develop clear gender objectives, monitor progress and achievements, and report these in a Gender Action Plan.

Occupational Health and Safety (OHS), and Labor Working Conditions
: The ESDD identified the gaps with respect to OHS policy and procedures and recommends development of the Health and Safety Management Plan ("HSMP"). OHS indicators have been developed to continuously monitor the OHS performance of the Project. Safety training is also provided for the workers at the project site. Additionally, OMNIA's Human Resources, Human Rights and Contractor Management Plans include specific measures to ensure compliance with IFC PS 2 requirements on Labor and Working Conditions, equally covered in AIIB's ESS1. OMNIA, through Patria, will develop suitable Codes of Conduct for workers employed under the Project. According to the ESAP, worker accommodation provided during construction and operations will demonstrate alignment with ESS1 requirements. As part of its ESMS, OMNIA will assess risks posed by using private security forces on its premises to people within and outside the Project site. In making such arrangements, the company will apply the principles of proportionality and GIIP and develop procedures to comply with applicable laws relating to hiring, codes of conduct, training, equipping, and monitoring of project security workers. A security management plan will be developed for the Project.

Stakeholder Engagement, Information Disclosure and Project Grievance Redress Mechanisms (GRM).
Fund Manager has ensured stakeholder engagement by OMNIA and SEP includes a stakeholder map that identifies all stakeholders including Indigenous People (IP) in the project area of influence, and with whom OMNIA have engaged and conducted meaningful consultation. OMNIA conducted stakeholder meetings in the project area and informed stakeholders about project activities and impacts before soliciting their comments and concerns. The Fund's Responsible Investment Policy (RIP) has been publicly disclosed on its website (
link
). ES information about the Project is already available in public domain. To ensure addressal of grievances from project stakeholder, OMNIA has established its GRM that is respectful of cultural and linguistic factors and is easily accessible to both direct and indirect stakeholders. External communications are managed both by OMNIA and a public relations company specializing in disseminating information effectively through various means. The information of established GRM and AIIB's Project-affected People's Mechanism (PPM) will be disclosed timely in an appropriate manner.

Monitoring and Reporting Arrangement.
As this is a co-investment, monitoring and reporting requirements has been discussed and agreed with the Fund Manager that will apply to the Project. Additionally, the Fund Manager will provide quarterly updates on ESAP implementation. The following monitoring and reporting requirements will be applied: (i) OMNIA's ESMPs monthly monitoring results to be shared with Patria Fund V during construction works; (ii) ESMP and ESAP monitoring reports to be sent by Patria Fund V to AIIB after each ES Subcommittee meeting of Patria Fund V; and (iii) enhanced monitoring during the first two years of construction to ensure social risks are being managed appropriately to AIIB's satisfaction.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

AIIB

 

ACCESS TO INFORMATION

 

You can submit an information request for project information at: https://www.aiib.org/en/contact/information-request/index.html.

 

ACCOUNTABILITY MECHANISM OF AIIB

The AIIB has established the Accountability Mechanism for Project-Affected People (PPM).  The PPM provides “an opportunity for an independent and impartial review of submissions from Project-affected people who believe they have been or are likely to be adversely affected by AIIB’s failure to implement the ESP in situations when their concerns cannot be addressed satisfactorily through Project level GRMs or AIIB Management processes.” Two or more project-affected people can file a complaint.  Under the current AIIB policy, when the bank co-finances a project with another development bank, it may apply the other bank's standards. You can refer to the Project Summary Information document to find out which standards apply.  You can learn more about the PPM and how to file a complaint at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/how-we-assist-you/index.html.

 