ENEL LATAM - BRAZIL DISTRIBUTION (FL 20200823) (EIB-20210751)

Regions
  • Latin America and Caribbean
Geographic location where the impacts of the investment may be experienced.
Countries
  • Brazil
Geographic location where the impacts of the investment may be experienced.
Specific Location
Sao Paulo region
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • European Investment Bank (EIB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
U
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Borrower
ELETROPAULO METROPOLITANA ELETRICIDADE DE SAO PAULO SA
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 200.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Project Cost (USD)
$ 422.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ EIB website

Updated in EWS Oct 18, 2023

Disclosed by Bank Nov 23, 2022


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to the Bank’s website, this investment is an allocation of funds under the Enel Energy & Renewable framework loan, consisting of electricity distribution investments in Brazil. These aim to extend and modernise the network, add new renewable energy capacity to the network, reduce losses and improve quality and safety of supply.

The project consists of the financing of the modernisation and extension of the Promoter's electricity distribution networks in the São Paulo region and of the installation of new remote control systems and protections of the grid, with the aim of increasing the its reliability, resilience and reducing the level of losses, leading to better quality and safety of energy supply. A portion of the investment will also enable the connection to additional renewable generation units.

The investment comprises the construction or replacement of LV and MV overhead lines up to a max of 34.5 kV, the development of new electricity distribution facilities, including new metering substations and transformers, as well as other operations of refurbishment, reconstruction or modernisation of existing facilities. The investments are located mainly in urban or sub-urban areas of Sao Paulo. The majority of the interventions are focused on improving metering devices, installation of cables spacer, re-connecter and trip-saver that if located in the EU, would fall neither under Annex I nor under Annex II of the EIA Directive. The remaining components do not require an EIA following Brazilian regulation based on National legislation Resolução Conama nº 1 of 23/01/1986 and the State legislation Resolução Sima nº 29, of 29/04/2020 due to the fact that they are extensions of a previous existing network and the voltage is below the threshold of 69 kV.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.
Private Actor 1 Private Actor 1 Role Private Actor 1 Sector Relation Private Actor 2 Private Actor 2 Role Private Actor 2 Sector
- - - - Enel Brasil Client -

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

No contact information provided at the time of the disclosure.

ACCESS TO INFORMATION

You can submit an information request for project information at: https://www.eib.org/en/infocentre/registers/request-form/request-form-default.htm

ACCOUNTABILITY MECHANISM OF EIB

The EIB Complaints Mechanism is designed to facilitate and handle complaints against the EIB by individuals, organizations or corporations affected by EIB activities. When exercising the right to lodge a complaint against the EIB, any member of the public has access to a two-tier procedure, one internal - the Complaints Mechanism Office - and one external - the European Ombudsman. A complaint can be lodged via a written communication addressed to the Secretary General of the EIB, via email to the dedicated email address: complaints@eib.org, by completing the online complaint form available at the following address: http://www.eib.org/complaints/form via fax or delivered directly to the EIB Complaints Mechanism Division, any EIB local representation office or any EIB staff. For further details, check: http://www.eib.org/attachments/strategies/complaints_mechanism_policy_en.pdf

When dissatisfied with a complaint to the EIB Complaints Mechanism, citizens can then turn towards the European Ombudsman. A memorandum of Understanding has been signed between the EIB and the European Ombudsman establishes that citizens (even outside of the EU if the Ombudsman finds their complaint justified) can turn towards the Ombudsman on issues related to 'maladministration' by the EIB. Note that before going to the Ombudsman, an attempt must be made to resolve the case by contacting the EIB. In addition, the complaint must be made within two years of the date when the facts on which your complaint is based became known to you. You can write to the Ombudsman in any of the languages of the European Union. Additional details, including filing requirements and complaint forms, are available at: http://www.ombudsman.europa.eu/atyourservice/interactiveguide.faces

How it works

How it works