Energy Valley (EBRD-57439)

Regions
  • Middle East and North Africa
Geographic location where the impacts of the investment may be experienced.
Countries
  • Egypt
Geographic location where the impacts of the investment may be experienced.
Specific Location
East Minya; Abo Qir, Alexandria; Al Sarirya; Nagaa Hammadi, Qena
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • European Bank for Reconstruction and Development (EBRD)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Approved
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
A
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Borrower
Scatec ASA
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
Not Disclosed
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ EBRD website

Updated in EWS Sep 7, 2026

Disclosed by Bank Sep 4, 2026


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

As stated by the EBRD, the project includes the development, construction and operation by Scatec of a 1.95 GW solar PV plant and 3.935 MWh BESS with associated grid connection. The project will be implemented in 4 locations:

  • Site 1: Hybrid - Minya site: 1.95 GW solar PV and 1.5 GWh BESS located in East Minya.
  • Site 2: Consumer substation: 500/220/22 kV Sub-station and 500 kV, 2.5 km Overhead Transmission line located in Al Sarirya.
  • Site 3: Abu Qir: 1.435 GWh BESS, along with 33/220 kV substation located in Abo Qir, Alexandria.
  • Site 4: Nagaa Hammadi: 1.0 GWh BESS along with a 33/220kV substation and Overhead Transmission Line located in Nagaa Hammadi, Qena.
Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Information on the investment amount was not provided at the time of disclosure.

Private Actors Description
A Private Actor is a non-governmental body or entity that is the borrower or client of a development project, which can include corporations, private equity and banks. This describes the private actors and their roles in relation to the project, when private actor information is disclosed or has been further researched.

As stated by Bloomberg, Scatec ASA operates as an energy company. The Company develops, builds, owns, operates and maintains solar, hydro, and wind power plants that generate clean and reliable electricity. Scatec serves customers worldwide.

Private Actor 1 Private Actor 1 Role Private Actor 1 Sector Relation Private Actor 2 Private Actor 2 Role Private Actor 2 Sector
- - - - Scatec ASA Client Energy

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

ESIA locally available at:

  • EBRD Cairo Resident Office, EGID Building, First Floor, Block 72, off Ninety Axis, 5th Settlement, New Cairo, Cairo
    Phone: +20 35419155
  • EBRD Alexandria Resident Office, Regus offices, Kamarayet Roushdy building, Stanley - Corniche, Alexandria
    Phone: +20 223225900

 

Client - Scatec ASA:

Shady Khafagy
Address: Scatec – Egypt Office, Building 44, The Northern 90th street, banks center, New Cairo, Cairo
Email: post@scatec.com
Phone: +47 480 85 500
Website: https://www.scatec.com/en/sustainability/esg-resources/

ACCESS TO INFORMATION

You can request information by emailing: accessinfo@ebrd.com or by using this electronic form: https://www.ebrd.com/eform/information-request

ACCOUNTABILITY MECHANISM OF EBRD

The Project Complaint Mechanism (PCM) is the independent complaint mechanism and fact-finding body for people who have been or are likely to be adversely affected by an European Bank for Reconstruction and Development (EBRD)-financed project. If you submit a complaint to the PCM, it may assess compliance with EBRD's own policies and procedures to prevent harm to the environment or communities or it may assist you in resolving the problem that led to the complaint through a dialogue with those implementing the project. Additionally, the PCM has the authority to recommend a project be suspended in the event that harm is imminent.

You can contact the PCM at: pcm@ebrd.com or you can submit a complaint online using an online form at: http://www.ebrd.com/eform/pcm/complaint_form?language=en