According to AIIB, the objective of this project is to improve the reliability and capacity of the power transmission network in Southern Chattogram and Kaliakoir region of Bangladesh.
This project envisages the construction of four transmission lines with a total length of approximately 181 km, four Gas-Insulated Switchgear (GIS) substations, and two bay extensions, to develop grid interfacing infrastructure in several parts of Chattogram and Gazipur region. Project components are as follows:
1. Southern Chattogram Region:
2. Kaliakoir, Gazipur Region:
ENVIRONMENTAL AND SOCIAL INFORMATION
The Bank's Environmental and Social Policy (ESP), including Environmental and Social Standards (ESSs) and the Environmental and Social Exclusion List, apply to this Project. ESS 1 (Environmental and Social Assessment and Management) and ESS 2 (Involuntary Resettlement) are applicable to the project activities. Category A has been preliminarily assigned due to the anticipated significant environmental and social impacts.
According to the bank, the proposed project activities have no significant adverse impacts on the environment except the involvement of a 9.19 km line passing through the Chunati Wildlife Sanctuary.Though all possible measures have been taken during route selection, the involvement of the wildlife sanctuary could not be avoided due to substations locations.However, considering there is an existing overhead line and ADB-financed railway line project under construction adjacent to the proposed line, the potential incremental impacts on the ecosystem are mostly predictable according to the previous anthropogenic activities. Any potential environmental impacts during project construction and maintenance phases will be assessed in the Environmental and Social Impact Assessment (ESIA) and mitigated through the implementation of the Environmental and Social Management Plan following the national regulations and AIIB's ESP and ESSs.
A Resettlement Plan (RP) is prepared to manage the economic displacement of 233 households whose lands will be acquired for the construction of 3 substations. Due diligence was done on the land for the 4th substation which will be on government land (Hi-Tech City) and confirms no legacy issues. Other management plans prepared to address other social concerns include Labor-Management Plan, Gender-based Violence Prevention Plan, and Stakeholder Engagement Plan. An implementation NGO will be engaged to assist PGCB, and an external monitor will be engaged to validate progress and recommend measures for improvement.
Public consultations have been carried out with project-affected households and key project stakeholders and will be continued during project implementation. A multi-tier grievance redress mechanism will be constituted for the project in line with the prescriptions of the Project-affected People's Mechanism (PPM) Policy of the Bank, building on the existing complaint mechanisms. The ESIA and RP will be disclosed on the client and AIIB's website once finalized along with the English and Bangla versions of the executive summaries of the ESIA and RP.
Md. Shahriar Kader Siddiky,
Joint Secretary & Wing Chief (Asia, JEC, F&F), Economic Relations Division (ERD), Ministry of Finance
ACCESS TO INFORMATION
You can submit an information request for project information at: https://www.aiib.org/en/contact/information-request/index.html
ACCOUNTABILITY MECHANISM OF AIIB
The AIIB has established the Accountability Mechanism for Project-Affected People (PPM). The PPM provides an opportunity for an independent and impartial review of submissions from Project-affected people who believe they have been or are likely to be adversely affected by AIIBÕs failure to implement the ESP in situations when their concerns cannot be addressed satisfactorily through Project level GRMs or AIIB Management processes.Two or more project-affected people can file a complaint. Under the current AIIB policy, when the bank co-finances a project with another development bank, it may apply the other bank's standards. You can refer to the Project Summary Information document to find out which standards apply. You can learn more about the PPM and how to file a complaint at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/how-we-assist-you/index.html
The complaint submission form can be accessed in Arabic, Bahasa Indonesia, Bengali, Chinese, English, Tagalog, Hindi, Nepali, Russian, Turkish, or Urdu. The submission form can be found at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/submission/index.html