According to bank's website, the proposed project would be the fourth in a sequence of flood protection initiatives implemented in Poland's two major river basins, the Odra and the Vistula. The sequence began in 1997, following the catastrophic floods in the Odra Basin, when the Government of Poland requested World Bank support for recovery. The Flood Emergency Project (1997-2005) responded by rehabilitating affected areas of the Odra River Basin and establishing a flood forecasting and warning system. Building on this emergency operation, the Odra River Basin Flood Protection Project (P086768, 2007-2020) implemented major structural measures to protect the basin from future flooding, covering the reach from Raciborz through the city of Wroclaw. It also further strengthened flood forecasting and improved the integration between forecasting and flood management. The third project in the sequence, the recently closed Odra-Vistula Flood Management Project (P147460, 2015-2025), extended flood protection infrastructure to the Middle and Lower Odra River Basin and the Upper Vistula Basin. In addition, it enhanced operational flood forecasting and established Flood Operation Centers. For this fourth project in the sequence, Poland has requested financing to implement flood risk management measures in currently unprotected reaches of the Upper and Middle Vistula Basin and to address persistent flood risks in the Nysa Klodzka catchment of the Odra Basin. The project would also respond to the growing risks posed by prolonged droughts experienced in recent years, which are expected to intensify and become more frequent under projected climate change. The Project Development Objective is to reduce flood and drought risks in Poland. It focuses on decreasing flood risk in the upper and middle Vistula Basin and the Biala Ladecka as a part of Nysa Klodzka catchment through enhanced flood protection infrastructure and forecasting, while reducing drought risk nationwide by increasing water retention capacity, strengthening drought forecasting and management, and improving water quality monitoring to benefit communities and ecosystems. The project comprises four components: (i) flood risk reduction through the construction of dry polders to protect major urban areas, including Krakow, Sandomierz, and Warsaw, as well as the Biala Ladecka catchment; (ii) drought risk reduction through multipurpose reservoirs (including the Kamieniec Zabkowicki multipurpose reservoir) and green retention measures; (iii) institutional strengthening for flood and drought forecasting, early warning, management, and water quality monitoring. This component will also finance a green scheme, yet to be identified, for improved water retention in the upper Vistula basin and Nysa Klodzka catchment; and (iv) project management and monitoring and evaluation to support effective implementation and knowledge sharing.
Environmental and Social Risk: H
Total Project Cost: US$ 1529.45 million
Commitment Amount: US$ 958.22 million
IBRD Commitment: US$ 479.11 million
Task Team Leader: Mahwash Wasiq
Title: Senior Water Resources Management Specialist
Email: Mwasiq@worldbank.org
TTL Contact: Toma Alexandrov Yanakiev
Title: Senior Transport Specialist
Email: tyanakiev@worldbank.org
ADM Environmental Specialist: Nikola Ille
ADM Social Specialist: Fajar Argo Djati
ACCESS TO INFORMATION
To submit an information request for project information, you will have to create an account to access the Access to Information request form. You can learn more about this process at: https://www.worldbank.org/en/access-to-information/request-submission
ACCOUNTABILITY MECHANISM OF THE WORLD BANK
The World Bank Inspection Panel is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by a World Bank-financed project. If you submit a complaint to the Inspection Panel, they may investigate to assess whether the World Bank is following its own policies and procedures for preventing harm to people or the environment. You can contact the Inspection Panel or submit a complaint by emailing ipanel@worldbank.org. Information on how to file a complaint and a complaint request form are available at: https://www.inspectionpanel.org/how-to-file-complaint