Bosnia and Herzegovina Scaling Up Renewable Energy Project (WB-P513984)

Regions
  • Europe and Central Asia
Geographic location where the impacts of the investment may be experienced.
Countries
  • Bosnia and Herzegovina
Geographic location where the impacts of the investment may be experienced.
Financial Institutions
  • World Bank (WB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
A
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Dec 11, 2026
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Government of Bosnia and Herzegovina - Elektroprivreda Bosne i Hercegovine (EPBiH), and others
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
  • Hydropower
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 265.10 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Project Cost (USD)
$ 265.10 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Bank Documents
Primary Source

Original disclosure @ WB website

Updated in EWS Aug 29, 2026

Disclosed by Bank Nov 18, 2025


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to the Bank’s website, the objective of this project is to increase renewable energy capacity and promote the development of the residential rooftop solar PV market in Bosnia and Herzegovina.

The Bosnia and Herzegovina Scaling Up Renewable Energy (SURE) Project aims to support Bosnia and Herzegovina (BiH) in maintaining energy security and affordability, enhancing economic competitiveness, and advancing the sustainable energy transition. To achieve these objectives, the project will finance investments to:
(i) increase renewable energy capacity through hydropower rehabilitation, solar photovoltaics (PV), and battery energy storage investments, and
(ii) promote the development of the residential rooftop solar PV market in BiH.

The project is structured into three components, each implemented by one of the three participating power utilities of BiH:
(i) Component 1: Scaling up renewable energy in ERS's area of operation;
(ii) Component 2: Scaling up renewable energy in EPBiH's area of operation; and
(iii) Component 3: Scaling up renewable energy in EPHZHB's area of operation.

Early Warning System Project Analysis
For a project with severe or irreversible impacts to local community and natural resources, the Early Warning System Team may conduct a thorough analysis regarding its potential impacts to human and environmental rights.

The Project’s overall environmental risk rating is proposed as Substantial, primarily due to the hydropower component at HPP Jajce II on the Vrbas River and the associated uncertainty and potential consequences related to compliance with future minimum environmental flow (e flow) requirements. Namely, rehabilitation works are confined to existing facilities, Jajce II is a diversion-type plant commissioned in 1954 and operating within an already regulated and altered hydrological regime. The plant has operated in this configuration for more than 50 years, during which the reservoir/accumulation and associated ecosystems have adjusted to the long standing altered regime, with flora and fauna specific to these conditions. Notwithstanding the above, the Project faces regulatory and operational uncertainty because Jajce II is currently operating under an existing e flow approach that is expected to be superseded through the issuance of a new water permit in October 2026. In parallel, Jajce II is associated with potential turbidity and water quality effects on downstream users. Audit for Jajce II notes that fine suspended sediments, organic matter, and related water quality parameters from Jajce II and the downstream Bocac reservoir can propagate along the Vrbas River. Consequently, the Novoselija water intake, situated approximately 50 kilometers downstream of Bocac, may be indirectly affected by upstream hydropower operations, particularly during periods of high or variable flows, even though coarser sediments are retained within the reservoirs and no direct sediment management occurs at either Jajce II or Bocac.

At Appraisal, the project’s Social Risk is rated as Substantial, primarily due to the scope and complexity of activities and the multi-utility implementation structure, as well as interface with dam safety. Since Salakovac draws water directly from reservoirs regulated by upstream dams, these dams have been identified as having the potential to cause extensive damage to or failure of the project facilities. Furthermore, risks remain elevated also because the project encompasses three power utilities (EPBiH, EPHZHB, ERS) implementing several different activities. This complexity increases needs for coordination and supervision and heightens risks. Key social risks include: - Land use/access: Minor, temporary restrictions may occur during installation, but involuntary resettlement risks are limited because activities are mostly within existing footprints and household participation in solar programs is voluntary.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Total Project Cost: US$ 265.10 million
IBRD Commitment: US$ 265.10 million


Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

CONTACT POINT - World Bank

Task Team Leader: Yuriy Myroshnychenko
Title: Senior Energy Specialist
Email: ymyroshnychenko@worldbank.org

TTL Contact: Claudio Protano
Job Title: Energy Specialist
Email: cprotano@worldbank.org

ACCESS TO INFORMATION

To submit an information request for project information, you will have to create an account to access the Access to Information request form. You can learn more about this process at: https://www.worldbank.org/en/access-to-information/request-submission

ACCOUNTABILITY MECHANISM OF THE WORLD BANK

The World Bank Inspection Panel is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by a World Bank-financed project. If you submit a complaint to the Inspection Panel, they may investigate to assess whether the World Bank is following its own policies and procedures for preventing harm to people or the environment. You can contact the Inspection Panel or submit a complaint by emailing ipanel@worldbank.org. Information on how to file a complaint and a complaint request form are available at: https://www.inspectionpanel.org/how-to-file-complaint

How it works

How it works