Assam Disaster Resilient Hill Roads Development Project (ADRHRDP) (WB-P510002)

Regions
  • South Asia
Geographic location where the impacts of the investment may be experienced.
Countries
  • India
Geographic location where the impacts of the investment may be experienced.
Specific Location
Assam
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • World Bank (WB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Approved
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
A
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Jan 13, 2026
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Government of India - Assam Public Works (Roads) Department, EAP
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Infrastructure
  • Transport
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 355.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Project Cost (USD)
$ 443.75 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Bank Documents
Primary Source

Original disclosure @ WB website

Updated in EWS Oct 13, 2026

Disclosed by Bank Mar 13, 2025


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to the Bank’s website, the proposed project development objective is to enhance the climate disaster resilience of hill roads and promote sustainable and inclusive development in hilly areas of Assam.

The project focuses on upgrading 360 km of damaged roads with climate-resilient features to mitigate flooding and landslides. It includes widening roads, stabilizing slopes using civil and bioengineering methods, enhancing drainage and bridge structures, and developing alternative escape routes. Rehabilitation efforts will involve pavement reconstruction and drainage improvements, supported by Performance-Based Maintenance Contracts and various consultancy services. Additionally, an electronic Project Management System will be implemented for real-time monitoring, alongside Road User Satisfaction Surveys and technical advisory support from academic institutions. The project will introduce a digital system for real-time inspection and monitoring of road works, alongside an institutional review to strengthen Assam's Road Safety Lead Agency. Work zone safety will be integrated throughout, with an independent road safety audit ensuring best practices.

The project aims to develop a green rural freight and public transportation system by establishing rural logistics hubs equipped with EV charging stations, solar-powered infrastructure, and amenities like workshops, refreshment areas, and transport bays. It includes a freight terminal linked to a district industrial park, demonstration ropeways for farm produce, and georeferenced transport stations with high-speed internet. Additional facilities include packaging, storage, sanitation, and roadside marketplaces. The project focuses on enhancing climate resilience and disaster preparedness in road infrastructure. It includes developing a climate adaptation framework/policy through multi-hazard risk analysis, integrating structural and bioengineering solutions into road design and maintenance. A Flood and Landslide Early Warning System (FLEWS) will be established to improve monitoring, forecasting, and communication with road users and communities, integrated into APWRD's Road Asset Management System. Additionally, institutional capacity will be strengthened through the formulation of a robust transport emergency management and response plan to ensure rapid recovery after disasters.

Early Warning System Project Analysis
For a project with severe or irreversible impacts to local community and natural resources, the Early Warning System Team may conduct a thorough analysis regarding its potential impacts to human and environmental rights.

The Assam Hill Roads Project presents significant environmental and social risks due to its implementation in the ecologically sensitive and topographically complex Dima Hasao district. Environmental risks include soil erosion, slope instability, landslides associated with hill cutting and excavation, and pollution from dust, noise, wastewater, and improper waste disposal. The project area lies within the Indo-Burma biodiversity hotspot. It includes road corridors near Key Biodiversity Areas (KBAs), Reserved Forests, and Critical Habitats, posing potential risks to endangered flora and fauna. Additional concerns include the extensive generation of surplus excavated earth during construction, which, if not correctly managed, could lead to sedimentation, disposal issues, and environmental degradation. Indirect and cumulative impacts, such as increased traffic, sedimentation, and overlapping infrastructure investments, may contribute to long-term environmental degradation if not properly managed.

On the social side, the project involves land acquisition and livelihood impacts, particularly affecting Indigenous/Tribal communities in the Dima Hasao district. These impacts include both physical displacement and loss of income generating assets. Labor influx during construction poses additional risks, including pressure on local services, increased exposure to communicable diseases, and potential for sexual exploitation, abuse, or harassment (SEA/SH). Road safety is a significant concern in steep and landslide-prone areas, especially for communities close to the alignment. Culturally significant sites have also been identified along the corridors—for example, two inscribed stones were found near one of the priority road alignments—and while direct impacts are not anticipated, chance find procedures will be applied to all civil works to manage any discoveries. Over the long term, improved road connectivity may lead to changes in settlement patterns, land use, and social dynamics, which will require careful monitoring and inclusive stakeholder engagement.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Total Project Cost: US$ 443.75 million
IBRD Commitment: US$ 355.00 million


Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

CONTACT POINT - World Bank

Task Team Leader: Vijetha Bezzam
Title: Senior Transport Specialist
Email: vbezzam@worldbank.org

TTL Contact: Iguniwari Thomas Ekeu-Wei
Job Title: Disaster Risk Management Specialist
Email: iekeuwei@worldbank.org

TTL Contact: Tesfamichael Nahusenay Mitiku
Job Title: Senior Transport Engineer
Email: tnahusenay@worldbank.org

Borrower/Client/Recipient
Department of Economic Affairs (DEA)
Ms. Manisha Sinha
Additional Secretary (OMI, Crypto & FB)
manisha.sinha@nic.in

Implementing Agencies
Assam Public Works Department (Roads) EAP
Mr. Anbamuthan M.P
Project Director
as-ce.adrhardp@assam.gov.in

ACCESS TO INFORMATION

To submit an information request for project information, you will have to create an account to access the Access to Information request form. You can learn more about this process at: https://www.worldbank.org/en/access-to-information/request-submission

ACCOUNTABILITY MECHANISM OF THE WORLD BANK

The World Bank Inspection Panel is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by a World Bank-financed project. If you submit a complaint to the Inspection Panel, they may investigate to assess whether the World Bank is following its own policies and procedures for preventing harm to people or the environment. You can contact the Inspection Panel or submit a complaint by emailing ipanel@worldbank.org. Information on how to file a complaint and a complaint request form are available at: https://www.inspectionpanel.org/how-to-file-complaint

How it works

How it works