Contribute Information
Can you contribute information about this project?
Contact the EWS Team
According to the Bank’s website, the Project Development Objective is to increase the area under sustainable landscape management practices in targeted areas within the Dniester River Basin in Moldova.
The project intends to restore ecosystem processes directly, it will result in expanded areas of healthier ecosystems (restored functionality) and broader range of generated ecosystem services (benefits). All this will ultimately improve landscape/habitat conditions and water quality through reanimated synergies between upstream and downstream ecosystems.
Nature-based solutions (NBS) are defined as use of resources and processes already found in nature to restore ecosystems, support communities, and contribute to healthy and resilient economies. NBS for nutrient pollution management leverage, inter alia, the natural filtering and absorption capacities of ecosystems such as wetlands, forests to capture, retain, and remove nutrients like nitrogen and phosphorus from runoff, surface water, or groundwater.
The project addresses pollution of freshwater environment through enhanced adaptive capacity for upstream ecosystem restoration (at landscape level), all following the EU directives and the Dniester Commission.
The proposed Project's design consists of three components:
(i) Component 1: Institutional Capacity Development and Community Engagement;
(ii) Component 2: Landscape Restoration and Watershed Management and
(iii) Component 3: Project Management, Monitoring and Communication.
No significant environmental risks are expected neither at the construction or operation stages of the project. The envisaged environmental and social risks are considered moderate, which are related to minor civil works for wetland restoration, rehabilitation of small rivers beds and afforestation/ reforestation activities. While the proposed project will take the NBS approach, no significant civil works are anticipated. The areas of intervention will not interfere with special conservation zones as the Ramsar sites. Social risks are also considered moderate. Project interventions are expected to take place on public land (state or community) and no land acquisition and physical and economic resettlement are anticipared. Any involuntary restrictions to land use or natural resources (for example, site-specific temporary access restrictions at reforestation sites or civil work site) will be appropriately avoided, minimized and managed through close engagement with key stakeholders.
Total Project Cost: US$ 7.90 million
Global Environment Facility (GEF): US$ 7.90 million
CONTACT POINT - World Bank
Task Team Leader: Fisseha Tessema Abissa
Title: Senior Natural Resources ManagementSpecialist
Email: fabissa@worldbank.org
ACCESS TO INFORMATION
To submit an information request for project information, you will have to create an account to access the Access to Information request form. You can learn more about this process at: https://www.worldbank.org/en/access-to-information/request-submission
ACCOUNTABILITY MECHANISM OF THE WORLD BANK
The World Bank Inspection Panel is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by a World Bank-financed project. If you submit a complaint to the Inspection Panel, they may investigate to assess whether the World Bank is following its own policies and procedures for preventing harm to people or the environment. You can contact the Inspection Panel or submit a complaint by emailing ipanel@worldbank.org. Information on how to file a complaint and a complaint request form are available at: https://www.inspectionpanel.org/how-to-file-complaint