Contribute Information
Can you contribute information about this project?
Contact the EWS Team
According to the Bank’s website, the project development objectives are to increase flood control for people living in selected areas of Türkiye and to strengthen the country's institutional capacity for flood and drought risk management.
Components:
Component 1: Flood Management
Component 2: Drought Management
Component 3. Capacity Development and Institutional Strengthening
Component 4. Project Management
Environmental and social risks are rater as Substantial.
The potential environmental and social risks and impacts will be mostly relevant to Components 1 and 2 and be comprised of impacts on aquatic and terrestrial habitats due to construction of flood management structures, river bed alteration, water pollution, land clearance and impacts on floodplain habitats and vegetation, use of borrow and aggregate material as well as typical construction risks and impacts such as air and noise emissions, waste management, soil management, labor and working conditions, occupational health and safety risks, community health and safety (including traffic safety), risk of increased SEA/SH incidents due to labor influx; increased transmission risks of COVID-19 from incoming workers; structural safety of the flood protection structures depending on the size, habitat disturbance due to construction and economic displacement due to the required land acquisition for construction activities. Physical displacement is not expected.
A proposed loan in the amount of eur 559.3 million (us$600 million equivalent).
World Bank
Canan Yildiz Uz
Senior Water Resources Management Specialist
Salih Bugra Erdurmus
Senior Disaster Risk Management Specialist
Ahmed Shawky Mohamed Abdelghany
Senior Water Resources Management Specialist
Borrower/Client/Recipient
Ministry of Treasury and Finance
Kerem Donmez
Acting Director General
kerem.donmez@hmb.gov.tr
Implementing Agencies
State Hydraulic Works
Mehmet Akif Balta
Director General
mabalta@dsi.gov.tr
General Directorate of Water Management
Afire Sever
Director General
suyonetimi@tarimorman.gov.tr
ACCESS TO INFORMATION
To submit an information request for project information, you will have to create an account to access the Access to Information request form. You can learn more about this process at: https://www.worldbank.org/en/access-to-information/request-submission
ACCOUNTABILITY MECHANISM OF THE WORLD BANK
The World Bank Inspection Panel is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by a World Bank-financed project. If you submit a complaint to the Inspection Panel, they may investigate to assess whether the World Bank is following its own policies and procedures for preventing harm to people or the environment. You can contact the Inspection Panel or submit a complaint by emailing ipanel@worldbank.org. Information on how to file a complaint and a complaint request form are available at: https://www.inspectionpanel.org/how-to-file-complaint