Somali Electricity Sector Recovery Project (WB-P173088)

Countries
  • Somalia
Geographic location where the impacts of the investment may be experienced.
Financial Institutions
  • World Bank (WB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
A
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Jun 30, 2021
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Federal Republic of Somalia
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Grant
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 150.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ WB website

Updated in EWS Jun 19, 2021

Disclosed by Bank Jun 7, 2021


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to bank documents, the objective is to increase access to electricity services and to re-establish the electricity supply industry in the Project Areas.

The project will consist of the following four main components:

  1. Component 1 – Distribution network reconstruction, reinforcement and operations efficiency in the major load centers. Sub-transmission and distribution network reconstruction and reinforcement in the major load centers through integration of ESPs’ distribution networks and existing generation to optimize distribution network operations and scaleup of generation capacity. These activities will support the electricity service providers to: (a) decrease in the cost of operations; and (b) improve electricity supply and reliability. The proposed distribution and sub-transmission investments will enable the establishment of integrated distribution offtake infrastructure to enable scale-up of generation and interconnection with neighboring countries.
  2. Component 2 – Renewable energy generation optimization. Hybridization and optimization of existing generation for increased electricity supply through installation of Battery Energy Storage Systems (BESS) and solar PV systems at existing diesel-based generation stations. Such hybrid opportunities offer significant improvements in fuel efficiency, fuel consumption, extended generator lifespans, reducing GHG emissions and combustion pollution, along with less reliance on fuel imports. Further to the proposed efficiency enhancements under component 1, this subcomponent will support to increase the level of renewable energy penetration.

  3. Component 3 – Electricity services for improved public services delivery (Health, Education and Water Supply Institutions). This component will support activities to provide electricity to existing public facilities in rural and peri-urban areas, underpinned by the nation-wide geospatial plan. Key activities under this component are proposed to include new hybrid mini-grids and standalone solar PV systems augmented by BESS targeting public institutions as the anchor loads and where viable associated distribution network to connect other loads such as SMEs and households. Besides playing a key role in enablement of community co-benefits, facilities that have access to electricity may be better positioned to attract and retain skilled workers, especially in rural areas. Further, this will equip public service institutions to better respond to emergencies, such as COVID-19.

  4. Component 4 - Sector Capacity Enhancement and Project Implementation Capacity Support. Proposed activities include: (a) strengthening of sector governance and regulation to foster autonomy, accountability and transparency; (b) increasing sector operational efficiency; (c) undertaking of sector integrated planning analytics, including a Sector Least Cost Development Plan - covering generation, transmission and distribution - and an Electricity Access Plan, particularly for rural areas with related Investment Prospectus – both underpinned by a geospatial least-cost analysis. The technically sound sector plans will enable a sector-wide development framework to enhance crowding-in of funding, both private and public; and (d) project implementation support. Activities will also support to day-to-day sector undertakings with Business Support Services (BSSF) to re-establish the Somali electricity sector - providing hands-on policy, oversight, operations and management trainings and capacity building of sector staff.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

World Bank:
Patrick Thaddayos Balla, Paul Baringanire
Senior Energy Specialist

Borrower:
Federal Ministry of Finance
Dr. Abdirahman Duale Beileh
Minister of Finance
mof@mof.gov.so

Ministry of Finance, Somaliland
Dr. Saad Shire
Minister of Finance
info@slmof.org

Implementing Agencies:
Ministry of Energy and Minerals, Somaliland
Jama Mohamoud Egal
Minister of Energy and Minerals
Minister.Moem@sldgov.org

Federal Ministry of Energy and Water Resources (MoEWR)
Fowzia Mohamed Sheikh
Minister of Energy and Water Resources
minister@meowr.gov.so 

ACCESS TO INFORMATION

To submit an information request for project information, you will have to create an account to access the Access to Information request form. You can learn more about this process at: https://www.worldbank.org/en/access-to-information/request-submission 

ACCOUNTABILITY MECHANISM OF THE WORLD BANK

The World Bank Inspection Panel is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by a World Bank-financed project. If you submit a complaint to the Inspection Panel, they may investigate to assess whether the World Bank is following its own policies and procedures for preventing harm to people or the environment. You can contact the Inspection Panel or submit a complaint by emailing ipanel@worldbank.org. Information on how to file a complaint and a complaint request form are available at: https://www.inspectionpanel.org/how-to-file-complaint 

How it works

How it works