The proposed project seeks to increase the capacity and efficiency of generation and transmission system in the project area. The following project indicators are proposed to capture the development objectives:
1. Projected lifetime fuel savings (MJ);
2. Increase in power transfer capacity in the transmission grid (MW/year).
3. Increase in generation capacity (MW);
Borrowing Agency USD$ 10.00 million
International Development Association (IDA - World Bank) USD$ 160.00 million
1/World Bank
Sunil Kumar Khosla
Lead Energy Specialist
2/Borrower/Client/Recipient
Ministry of Finance
3/Implementing Agencies
Electric Power Generation Enterprise
Contact: U Khin Maung Win
Title: Managing Director
Email: ukhinmgwin09@gmail.com
Ministry of Electricity and Energy
Contact: U Htein Lwin
Title: Permanent Secretary
Email: hteinlwin.moep2@gmail.com
FOR MORE INFORMATION CONTACT
The World Bank
1818 H Street, NW Washington, D.C. 20433
Telephone: (202) 473-1000
Web: http://www.worldbank.org/projects
ACCOUNTABILITY MECHANISM OF WORLD BANK
The World Bank Inspection Panel is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by a World Bank-financed project. If you submit a complaint to the Inspection Panel, they may investigate to assess whether the World Bank is following its own policies and procedures for preventing harm to people or the environment. You can contact the Inspection Panel or submit a complaint by emailing ipanel@worldbank.org. You can learn more about the Inspection Panel and how to file a complaint at: http://ewebapps.worldbank.org/apps/ip/Pages/Home.aspx.