Morocco - Power Transmission Network Development and Rural Electrification Programme (PDRTE-ER) (AFDB-P-MA-FA0-008)

Countries
  • Morocco
Geographic location where the impacts of the investment may be experienced.
Financial Institutions
  • African Development Bank (AFDB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Approved
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
U
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Dec 10, 2019
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
*Borrower information not provided at the time of disclosure*
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 275.76 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ AFDB website

Updated in EWS Sep 9, 2020


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to bank documents, the programme's overall objective is to improve the security and efficiency of power supply in a sustainable development framework. Specifically, it aims to: (i) increase the transmission capacity of the national grid with a view to improving the security and efficiency of electricity supply and the overall technical performance of the national power system; (ii) guarantee the injection of additional power generated from renewable production sources (solar and wind) under development and the evacuation (transmission) of this energy to consumption centres or areas; and (iii) contribute to increasing the share of clean energy in the national electricity mix and mitigating the climate change impacts of power generation; and (iv) ensure widespread access to power supply in rural areas.

The Power Transmission Network Development and Rural Electrification Programme (PDRTE-ER) is an investment operation. It aims to improve the safety and efficiency of electricity supply in a sustainable development framework. The programme covers the construction and extension of: (i) power lines and substations (VHV and HV) to address current energy transmission constraints and ensure the evacuation of electricity to be generated through the development of additional production capacity, including renewable sources (solar and wind) and power grids (MV/LV) to provide widespread access to power in Moroccan rural areas. It will help to extend the interconnected grid and increase its transmission capacity, ensuring that the energy produced by solar and wind power plants under development or planned for 2020 can be evacuated. In addition, the PDRTE-ER contribute to the strong penetration of renewable and clean energy in the national energy mix, thus mitigating the effects of power generation on climate change, enabling Morocco to meet its national and international commitments in this area. The total cost of the programme is estimated at EUR 352.33 million. It will be carried out over five (5) years from 2020 to 2024. It comprises three components detailed below: (A) Power transmission; (B) Rural electrification; (C) Programme management.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

Name MOUSSA Adama
a.d.moussa@afdb.org 

ACCOUNTABILITY MECHANISM OF AfDB

The Independent Review Mechanism (IRM), which is administered by the Compliance Review and Mediation Unit (CRMU), is the independent complaint mechanism and fact-finding body for people who have been or are likely to be adversely affected by an African Development Bank (AfDB)-financed project. If you submit a complaint to the IRM, it may assist you by either seeking to address your problems by facilitating a dispute resolution dialogue between you and those implementing the project and/or investigating whether the AfDB complied with its policies to prevent environmental and social harms. You can submit a complaint electronically by emailing crmuinfo@afdb.org, b.kargougou@afdb.org, b.fall@afdb.org, and/or s.toure@afdb.org. You can learn more about the IRM and how to file a complaint at https://www.afdb.org/en/independent-review-mechanism/ 

How it works

How it works