Graca Aranha – Silvania Energy Transmission Project (NDB-GRACAARANHASILVANIA)

Regions
  • Latin America and Caribbean
Geographic location where the impacts of the investment may be experienced.
Countries
  • Brazil
Geographic location where the impacts of the investment may be experienced.
Specific Location
Presidente Dutra, Graca Aranha and Silvânia
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • New Development Bank (NDB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
U
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Borrower
Graca Aranha Silvania Transmissora de Energia SPV
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
  • Infrastructure
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 300.31 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 2190
Converted using 2025-04-21 exchange rate.
Loan Amount (USD)
$ 300.31 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 2190
Converted using 2025-04-21 exchange rate.
Project Cost (USD)
$ 3,546.59 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 20600
Converted using 2025-04-21 exchange rate.
Bank Documents
Primary Source

Original disclosure @ NDB website

Updated in EWS Jun 26, 2025

Disclosed by Bank Apr 21, 2025


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to the NDB, the Project will contribute to the expansion of power transmission infrastructure using modern technology to improve system reliability, increase inter-regional transmission capacity between the Northeast and Center-west, Southeast regions, and reduce curtailment of existing renewable energy sources and reduce power loss in transmission as compared to alternative transmission options.

The Project’s main components include: (a) construction, operation and maintenance of two electricity transmission lines (approx. total length 1,500 km) between Presidente Dutra, Graca Aranha and Silvânia; (b) development of two substations and associated equipment and interconnections at Presidente Dutra, Graca Aranha and Silvânia.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.
Private Actors Description
A Private Actor is a non-governmental body or entity that is the borrower or client of a development project, which can include corporations, private equity and banks. This describes the private actors and their roles in relation to the project, when private actor information is disclosed or has been further researched.

As stated by the NDB, State Grid Brazil Holding (SGBH) won the concession to construct, operate and maintain the Graça Aranha Silvânia Transmissora de Energia (GATE) Project. The Project will be developed by a special purpose vehicle, GATE SPV, wholly owned by SGBH.

As stated by Bloomberg, State Grid Brazil Holding S.A. provides utility services. The Company transmits and distributes electricity and power lines. State Grid Brazil Holding serves customers in Brazil.

Private Actor 1 Private Actor 1 Role Private Actor 1 Sector Relation Private Actor 2 Private Actor 2 Role Private Actor 2 Sector
- - - - State Grid Brazil Holding SA (SGBH) Client Energy

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

No project contacts provided at the time of disclosure.

ACCESS TO INFORMATION

You can submit an information request for project information though a form at the bottom of the following webpoage https://www.ndb.int/about-us/contact-us/. Alternatively, you can send an e-mail to info@ndb.int

ACCOUNTABILITY MECHANISM OF NEW DEVELOPMENT BANK

The New Development Bank (NDB) does not currently have an independent accountability mechanism to accept complaints related to NDB-financed projects. The Bank does have a whistleblower mechanism that receives complaints about misconduct related to corruption, fraudulent practices and instances of money laundering in projects financed by the NDB and/or against the NDB staff members. To learn more about the whistleblower mechanism and how to file a complaint, access this webpage at: https://www.ndb.int/about-us/whistleblowing/.

How it works

How it works