Power - Water Project (WB-P001709)

Countries
  • Mali
Geographic location where the impacts of the investment may be experienced.
Specific Location
Bamako, Segou and Mopti
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • World Bank (WB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Closed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
U
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Jul 6, 1982
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Government of Mali
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
  • Water and Sanitation
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
Not Disclosed
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ WB website

Updated in EWS Aug 8, 2024


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to the Bank’s website, the Power - Water Project is aimed at ensuring extended, more reliable and cost-effective service, primarily to urban but also to rural inhabitants through alleviation of the major managerial and operational constraints of the parastatal water supply and power utility Energie du Mali (EDM). The project will consist of: (i) a water supply component consisting of distribution system works; (ii) construction of facilities, supply of vehicles, and equipment for EDM operations; and (iii) a power component, including construction of a 2MW biomass power plant and distribution system works. To provide support for institutional rehabilitation, the project will also include financing of 65 work-years of consultant services for technical assistance to EDM management and for carrying out operational and sector policy studies. In addition, technical studies and preliminary designs will be carried out pursuant to the second stage of the program.

The IDA's Power/Water Project was part of a larger government rehabilitation program, financed by the CCCE, FAC, KfW and OPEC.

The overall objectives of the project were to extend and improve the supply of electricity and water to the population of Bamako, Segou and Mopti, and manage the sub-sector efficiently. Specifically, the objectives were: (i) to strengthen EDM's managerial and operational capability through a substantial TA project; (ii) to rehabilitate and extend the power and water distribution system of Bamako; (iii) to build a power generation plant in Mopti; and (iv) to study and design a transmission line to supply electricity to the Segou area.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

IDA Credit (SDR): 20.393.964

The audit could not find the information needed to establish the final cost for each item in US$ because during project implementation the value of the US$ varied considerably in relation to the European currency and the SDR.


Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

No contacts available at the time of disclosure.

How it works