Telecommunications Project (02) (WB-P001707)

Countries
  • Mali
Geographic location where the impacts of the investment may be experienced.
Specific Location
Bamako and others
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • World Bank (WB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Closed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
U
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Jan 7, 1982
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Government of Mali
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Communications
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Project Cost (USD)
$ 25.30 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ WB website

Updated in EWS Aug 8, 2024


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

The Second Telecommunications Project for Mali will enable OPT (Office des Postes et Telecommunications) to acquire and install physical facilities essential to the improvement and the expansion of its services. The project will provide for: (a) the construction of an automatic telephone exchange and the expansion of an existing exchange at a regional capital; (b) the substantial expansion of the local cable network in Bamako and the construction of such networks in about eight provincial cities; (c) the construction of a microwave radio relay link on the route Segou-Sevare; (d) the construction of a number of VHF (very high radio frequency), UHF (ultra high radio frequency), and SHF (super high radio frequency) links to serve district and sub-district centers; (e) the installation of a new telex exchange in Bamako; (f) tools, instruments, and vehicles for installation, operation, and maintenance; and (g) technical assistance for design engineering and maintenance of installations, local training and fellowships for training abroad.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Cost of the project:  Malian F. 12.70 billion or, following reintegration of Mali into the West African Monetary Union in 1986, ClAP 6.35 billion (US$25.30 million equivalent).

 


Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

No contacts available at the time of disclosure.

How it works