According to the EBRD, the project consists of a senior secured loan on a non-recourse basis in favour of Aktas Energy LLP, which will be owned by TotalEnergies Renewables (60%, subsidiary of TotalEnergies), KMG Green Energy LLP (20%, subsidiary of NC KazMunayGas JSC) and Qazaq Green Power PLC (20%, subsidiary of Samruk-Energy JSC), to finance the development, construction, commissioning, operation and maintenance of an onshore wind power plant with a total capacity of 1,000 MW, using a 300 MW / 600MWh battery energy storage system near the village of Mirny, in the Zhambyl region in Kazakhstan.
This is a landmark project for Kazakhstan as it introduces a sizeable 600 MWh of BESS capacity, which balance the grid to mitigate the intermittency of renewables.
The Project includes construction of transmission infrastructure required for evacuation of generated renewable energy- three 500 kV overhead transmission lines of 231km length and upgrade of the existing 500 kV Shu and Yukgress substations.
The Project is expected to result in significant environmental benefits through introduction of 1 GW of new wind renewable energy capacity corresponding to yearly reduction of 2.48 million tonnes of CO2 emissions.
Information on the investment amount not provided at the time of disclosure.
As stated on the company's website, NC «KazMunayGas» JSC is Kazakhstan's national oil and gas company. It is engaged in exploration, production, transportation and refining of petroleum.
As stated on the company's website, Samruk-Energy JSC is the largest diversified electric power holding company [in Kazakhstan] with a primary objective of establishing a highly efficient energy supply system.
As stated by Bloomberg, TotalEnergies SE operates as an energy company. The Company produces, transports, and supplies crude oil, natural gas, and low carbon electricity, as well as refines petrochemical products. TotalEnergies owns and manages gasoline filling stations worldwide.
| Private Actor 1 | Private Actor 1 Role | Private Actor 1 Sector | Relation | Private Actor 2 | Private Actor 2 Role | Private Actor 2 Sector |
|---|---|---|---|---|---|---|
| NC KazMunayGas JSC | Parent Company | Energy | contracts with | SAMRUK-ENERGY JSC | Parent Company | Energy |
| NC KazMunayGas JSC | Parent Company | Energy | contracts with | Total Energies SE | Parent Company | Energy |
| SAMRUK-ENERGY JSC | Parent Company | Energy | contracts with | Total Energies SE | Parent Company | Energy |
Full ESIA documentation is available:
Locally at: Akimat in Ulken
Contact person: Nadira
Phone: +7 777 527 21 79
Address: Almatinskaia oblast', p.Ul'ken, 1 mkr., 2 dom/Almaty region, village Ulken, 1 microregion, 2nd house
Locally at: Akimat in Moyinkum
Contact person: Kazakbauily Nurkeldy
Phone: +8 (726 42) 2 43 99
Address: Zhambylskaia oblast', Moiynkumskii raion, s. Moiynkum, ul. Karbysheva, dom 2 Zhambylskaia oblast'/Zhambyl region, Moyyinkum rayon, 2, Karbysheva str.
Locally at: Akimat in Mirny
Contact person: Indira Omanova
Phone: +7 702 245 12 18
Address: Moiynkumskii raion, s. Mirnyi, ul. Abylaikhana, dom 7/Moiynlum region, village Mirny, 7, Abylaihana str.
Locally at: Administrative building, Shu City
Contact person: Zhandos Kurbanbayev
Phone: +7 701 985 41 80
Address: Zhambylskaia oblast', Shuiskii raion, g. Shu, ul. K.Satpaeva, dom 147 /Zhambyl region, Chu rayon, 147, Saptaeva str.
And
Aktas Energy LLP
Address: BC "Q", Block A, 7th floor, 15a Kabanbay Batyr avenue, Astana, 010000, Kazakhstan
Email: grievances.mirny@totalenergies.com
Website: www.mirny.kz
And
EBRD Resident Office in Astana, Kazakhstan
Address: Talan Towers offices BC, 16, Dostyk street, 23rd floor, Astana, Z05H9K3, Kazakhstan
Telephone: +7 7172 554246
Email: EbrdAstanaInfo@ebrd.com
Environmental or social enquiries:
Name: Tetiana Voitovych
Email: tetiana.voitovych@totalenergies.com
Website: www.mirny.kz
ACCESS TO INFORMATION
You can request information by emailing: accessinfo@ebrd.com or by using this electronic form: https://www.ebrd.com/eform/information-request
ACCOUNTABILITY MECHANISM OF EBRD
The Project Complaint Mechanism (PCM) is the independent complaint mechanism and fact-finding body for people who have been or are likely to be adversely affected by an European Bank for Reconstruction and Development (EBRD)-financed project. If you submit a complaint to the PCM, it may assess compliance with EBRD's own policies and procedures to prevent harm to the environment or communities or it may assist you in resolving the problem that led to the complaint through a dialogue with those implementing the project. Additionally, the PCM has the authority to recommend a project be suspended in the event that harm is imminent.
You can contact the PCM at: pcm@ebrd.com or you can submit a complaint online using an online form at: http://www.ebrd.com/eform/pcm/complaint_form?language=en
You can learn more about the PCM and how to file a complaint at: http://www.ebrd.com/work-with-us/project-finance/project-complaint-mechanism.html