PT. Domas Agrointi Prima (DFC-DOMAS)

Countries
  • Indonesia
Geographic location where the impacts of the investment may be experienced.
Specific Location
Kuala Tanjung, appr 120 km southeast of the city of Medan in North Sumatra, Indonesia
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • US International Development Finance Corporation (DFC)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
A
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Borrower
Pacific Harbor Group
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Industry and Trade
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
Not Disclosed
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ DFC website

Updated in EWS Jun 15, 2020


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to the bank document, "the Project involves the restart of operations of DAP’s oleochemical plant, which is currently mothballed, and the expansion of its facilities and production capacity. The Project facilities will utilize crude palm oil, palm kernels and palm kernel oil as raw material feedstocks for their oleochemical production processes. 

The total annual combined capacity will be approximately 200,000 metric tons of fatty acid and fatty alcohol. The plan has kernel crushing capabilities of approximately 160,000 metric tons per year and
refining capacity of approximately 500,000 metric tons per year. Supporting facilities will include a 2.7 km jetty, which is partially built, and a 22 MW natural gas-fired power station that will supply electricity for the Project operation.

The Project is located on a land area of approximately 114 ha in the industrial estate of Kuala Tanjung, approximately 120 km southeast of the city of Medan in North Sumatra, Indonesia".

Investment Description
Here you can find a list of individual development financial institutions that finance the project.
Private Actor 1 Private Actor 1 Role Private Actor 1 Sector Relation Private Actor 2 Private Actor 2 Role Private Actor 2 Sector
- - - - Pacific Harbor Group Undisclosed -
- - - - PT. Domas Agrointi Prima Client -

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

The Company will make available in the local language, a copy of the Supplemental Environmental and Social Impact Assessment by mid-November 2017 at the following locations:

1. Desa Kuala Indah
a. Kantor Kepala Desa Kuala Indah
Jalan Datuk Panglima Tenggang No 03 dusun 2 Desa Kuala Indah Kecamatan Sei Suka.
Kabupaten Batubara kode pos 21257.

b. Mushollah ( Mesjid ) Al Munawaroh.
Jalan Datuk Panglima Tenggang Dusun 2 Desa Kuala Indah Kecamatan Sei Suka
Kabupaten Batubara Kode Pos 21257.

c. SMP Negri 4 Sei Suka.
Jalan Datuk Panglima Tenggang dusu 2 Desa Kuala Indah Kecamatan Sei Suka
Kabupaten Batubara. Kode Pos 21257.

2. Desa Kuala Tanjung.
a. Kantor Kepala Desa Kuala Tanjung.
Jalan Pematang Sijago Dusun 1 Desa Kuala Tanjung Kecamatan Sei Suka
Kabupaten Batubara Koda Pos 21257.

b. Mushollah ( Mesjid ) Al Amin.
Jalan Pematang Sijago Dusun 1 Desa Kuala Tanjung Kecamatan Sei Suka
Kabupaten Batubara Kode Pos 21257.

c. SD Madrasah Ibtidaiyah.
Jalan Acces Road Inalum km 16 Dusun 3 Alai Desa Kuala Tanjung Kecamatan Sei Suka
Kabupaten Batubara Kode Pos 21257.

3. Desa Lalang.
a. Kantor Kepala Desa Lalang.
Jalan Acces Road Inalum km 15 Desa lalang Kecamatan Medang Deras
Kabupaten Batubara Kode Pos 21257.

b. Musollah (Mesjid) Al Hikmah .
Jalan Acces Road Simpang Sono km 15 Desa Lalang Kecamatan Medang Deras
Kabupaten Batubara Kode Pos 21257.

c. SMP Negri 2.
Jalan Acces Road km 95 Desa Lalang Kecamatan Medang Deras
Kabupaten Batubara Kode Pos 21257.

How it works

How it works