Myanmar: Myingyan Power Plant Project (AIIB-0007)

Countries
  • Myanmar
Geographic location where the impacts of the investment may be experienced.
Specific Location
Taungtha, Mandalay region, Myanmar
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • Asian Infrastructure Investment Bank (AIIB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Approved
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
A
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Sep 27, 2016
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Semcorp Utilities Pte. Ltd.
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
The service or industry focus of the investment. A project can have several sectors.
Potential Rights Impacts
  • Healthy Environment
  • Housing & Property
  • Labor & Livelihood
  • Right to Food
  • Right to Health
  • Right to Water
Only for projects receiving a detailed analysis, a broad category of human and environmental rights and frequently at-risk populations.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 20.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Loan Amount (USD)
$ 20.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Bank Documents
Primary Source

Original disclosure @ AIIB website

Updated in EWS May 10, 2023


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

***The following Early Warning System alert was initially published in January 2016 when IFC proposed funding for this project. In September 2016, mere days before its board would consider the project, the newly formed Asian Infrastructure Investment Bank announced that it was considering co-financing the Myingyan project. This alert has been updated accordingly. The following Early Warning System Alert has been prepared in partnership with the NGO Forum on ADB, an Asian-led network of civil society organizations, based in Asia and the Pacific region who monitor the Asian Infrastructure Investment Bank and the Asian Development Bank.***

Risk Assessment: Category A. This project is co-financed by the Asian Infrastructure Investment Bank, International Finance Corporation (IFC), and the Asian Development Bank (ADB). As this is co-financed, the AIIB will apply IFC's environmental and social standards and policies. The IFC classifies the Project as a Category A project because it is a large, complex project with correspondingly significant risks and impacts on the environment. According to the IFC’s environmental and social review procedure, this project has been classified as Category A “due to concerns about expansion of industrial activities in this rural area including cumulative impacts to air quality’ influx of migrant construction labor, and the related community health and safety risks; and potential relocation of approximately 5 to 10 families of settlers without land titles or legal claims along the river water pipeline right of way.”

The Myingyan project is an investment to “build, own and operate a greenfield 225 MW Combined Cycle Gas Turbine (CCGT) power plant in the Mandalay region of Myanmar.” In addition to IFC, ADB, and potentially AIIB funding, A consortium of Sembcorp Utilities Pte. Ltd and MMID Utilities Pte. Ltd will develop and operate the project. The Project includes the construction and operation of the following facilities:

- 225MW Combined Cycle Gas Turbine Power Plant;
- Gas Supply Pipeline;
- 230kV Overhead Transmission Line; and
- Water Supply Pipeline, Wastewater Discharge Pipeline and Water Intake Pumping Station.

Project documents state that construction will begin in the first quarter of 2016, with an aim to open the project facilities for operation by the first quarter of 2018.

Location: The project is located in Taungtha, a township of the Myingyan District in the Mandalay Divison of central Myanmar. The power plant will occupy about 11.6 hectares, which will be situated within a 280 hectare government-owned and operated steel mill site (Myingyan Steel Mill No.4).

Resources needed: 8 hectares of land acquired for a 12 kilometer cooling water supply line and 3 kilometer overhead power transmission line, affecting 8 to 10 families without legal claims whose homes and small businesses may be physically displaced. 

Early Warning System Project Analysis
For a project with severe or irreversible impacts to local community and natural resources, the Early Warning System Team may conduct a thorough analysis regarding its potential impacts to human and environmental rights.

APPLICABLE SOCIAL & ENVIRONMENTAL STANDARDS

Based on IFC documents, the following environmental and social safeguard policies are triggered:

PS 1 – Assessment and Management of Environmental and Social Risks and Impacts - triggered due to construction effects identified by project documents, including: air quality impacts, surface water quality, “noise during site preparation, … as well as increased traffic in access roads; …soil and groundwater from potential leaks and spills of oil, lubricants, or fuel from heavy equipment; construction waste management; and community health and safety impacts due to increased traffic and influx of construction workers.” Operational effects identified by project documents include: “impacts to air quality…(mainly [nitrogen oxide] emissions); surface water quality due from domestic wastewater discharge; noise associated with the operation of the power plant;… generation of various types of non-hazardous and hazardous wastes from plant [operations & maintenance] activities; and community health and safety” in the event of a natural gas leak.

PS 2 - Labor and Working Conditions - triggered due to the workforce required for the construction and operation of this project. The average workforce during construction is 600 people, with a peak of 900 people “at the height of construction activities.” The expected operational workforce is 48 people.

PS 3 - Resource Efficiency and Pollution Prevention - triggered due to issues related to noise, vibrations, dust and wastewater emissions, and hazardous waste generation during project construction and operation. Emissions may impact air quality in the project area and surrounding villages.

PS 4 – Community Health, Safety and Security - triggered due to “the risk of accidents for the general public during construction,” “raw water intake from the Ayeyarwady River,” which may impact other users of the river, possible community exposure to diseases with the influx of laborers, the possibility of emergencies such as a“fire or explosion due to the use of natural gas at the proposed project site,” and the deployment of “unarmed security personnel” at the project site.

PS 5 – Land Acquisition and Involuntary Resettlement - triggered because “land acquisition for the approximate [12 kilometer] cooling water supply line and the approximate [3 kilometer] overhead power transmission line...will be managed by the Myanma Electric Power Enterprise (MEPE) and will involve an area of about 8 [hectares].” Additionally, approximately 8 to 10 “families of settlers without land titles or legal claims occupying the irrigation canal [right-of-way] will be affected with the potential effects including physical displacement of small businesses (i.e tea shop or food stores), homes, and removal of small plantations of fruit trees.”


OUR RISK ASSESSMENT

Based on the IFC’s project documents, this project poses potential risks to the following human rights:

Right to Property & Adequate Housing
According to the Asian Development Bank’s Resettlement Framework, the project site is located within a larger site that “economically displaced about 130 villagers from the Sa Khar, Hnan Hwa, and Hpet Taw villages, in a Government-led land acquisition process” from 1998-2000. The larger 280 hectare site is fenced. However, as of 2015, “it was observed that fences were opened in some 2 places by the villagers from Sa Khar to use the site for informal fire wood collection and cattle grazing.” The Asian Development Bank’s Resettlement Framework states that in addition to land informally used for agriculture, “there are approximately 8 to 10 families of settlers without land titles or legal claims with the potential effects including physical and economic displacement of small businesses (i.e tea shop or food stores) and residences.”

Right to Livelihood
The physical displacement of small businesses due to land acquisition for the water supply and overhead power transmission line may impact the right to livelihood for the 8-10 families living in the project area. Additionally, according the IFC’s Social Impact Assessment, agriculture is the main source of income for local villagers, and much of the pipeline route “typically forms a part of a large plot of land” used for seasonal crop production. To the extent that people rely on the crops and fruit trees that will be removed during project construction as a source of livelihood, that right may be impacted.

Right to Food
To the extent that local villagers use the land along the water pipeline to grow crops for their households, the right to food may be impacted when this land is acquired by the project.

Right to Water
Without adequate safeguards, there is a risk that hazardous waste generated by the project may contaminate surrounding groundwater and surface water sources used by local villagers for consumption and household activities.

Right to a Healthy Environment
Construction is expected to create 27,803.65 tonnes carbon dioxide-equivalent, and operation of the combine cycle gas turbine will emit approximately 731,000 tonnes carbon dioxide-equivalent annually. According to project documents, the construction activities with the most significant “potential air quality impact is fugitive dust emissions from the power plant site.” During the operational phase, the most significant air quality impact is “power plant stack emissions due to combustion of natural gas.” Air quality is already degraded in the project area due to the adjacent presence of an operating steel mill also undergoing construction and an operating natural gas fired reciprocating engine power plan. Levels of nitrogen oxide and particulate matter are already high, and “[c]onstruction activities will temporarily contribute to increased levels of dust.”
- Of the anticipated sources of wastewater discharges and runoff, “the most significant by volume is considered to be sanitary wastewater which will be generated at an estimated rate of 48,000 liter/day.” The most significant source of emissions during the operational phase “will be the power plant’s closed circuit cooling systems blowdown which will generate approximately 70.5 m3/hr of cooling water discharge, followed by sanitary wastewater from operations (from an estimated workforce of 48 employees).”
- The project documents identify four “noise sensitive receivers” that may be affected by the use of powered mechanical equipment, as well as other construction and operation noise sources: “a permanent steel mill construction worker (EPC) accommodation in Taung Tha Township (approximately 1890 m to the south of the project site); a monastery and pagoda in Taung Tha Township (approximately 2400 m to the south); Hnan Ywa Village in Taung Tha Township (approximately 1960 m to the south-east); and Sa Ka Village in Myingyan Township (approximately 980 m to the north-east).” Vibrations also may damage community infrastructure.
- Hazardous waste materials potentially generated during the construction and operational phase include: “used paint, engine oils, hydraulic fluids, spent solvents, spent batteries, and other potentially hazardous materials generated from construction equipment maintenance and repair.” Hazardous materials will also be stored on site, including: “liquid fuel (diesel), gas cylinders, hydrochloric acid, sulfuric acid, caustic soda, sodium hypochlorite/chlorine, solvents, lubricating oils, transformer oil and other chemicals.”

Right to Health
The influx of construction workers and in-migration may introduce and increase the spread of communicable and sexually transmitted diseases. According to the Environmental and Social Impact Assessment, “Myanmar has one of the highest rates of HIV/ AIDS infection in Southeast Asia, which increases the risk of HIV/ AIDS being transmitted.” Tuberculosis is also prevalent in the villages surrounding the project area. Additionally, heavy rainfall during the wet season in Myanmar may create vector habitats where construction activities create trenches and other areas of standing water. As a result, project activities may contribute to an increase in vector borne diseases, with malaria being a notable risk. According to project documents, the populations most likely impacted by community health risks are: “Sa Khar, Hnan Ywa and Tha Pyay Thar villages and the steel mill workers.”
- According to project documents, safety-related issues include: traffic accidents, community member injuries due to the presence of new infrastructure, and hazardous material and waste management.

Labor Rights
During the construction process, the 600-900 construction workers who will be on the project site may be at risk for injuries and illnesses. Tuberculosis, vector-borne diseases like malaria, and sexually transmitted diseases such as HIV/AIDS are of particular concern. According to the Social Impact Assessment, the client will “implement a community health management plan and an occupational health and safety plan in consultation with relevant stakeholders (e.g. local health practitioners)” to ensure that worker illnesses and injuries are handled properly.

 

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Amount of bank loan or investment: IFC - $40 million. AIIB - $20 million.


Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

AIIB Officer:

Chuanzhi Su (csu@aiib.org)

 

CONSULTATIONS

With respect to AIIB funding, civil society groups, such as NGO Forum on ADB, have raised concerns over the fact that this project was publicly disclosed for AIIB funding several days before board consideration. The disclosure practices for this project also circumvent other disclosure requirements of co-financiers, such as the ADB requirement for 120 days notice before board approval for high risk Category A projects. NGO Forum on ADB has also raised issues with this project going forward where the AIIB has yet to approve an energy policy.

The available IFC documents provide information about existing and planned consultations. IFC documents state that, as part of the Environmental and Social Impact Assessment process, three rounds of local stakeholder consultations were conducted from June to September 2015. The purpose of the first round was to “disclose project information” and “gather stakeholder feedback,” while the purpose of the next two rounds were to provide updates on issues raised previously, to “present the outcomes of the impact assessment process, including management measures,” and to “gather stakeholder feedback.”

According to IFC - Villages and Consultation Dates (2015) were:
Sa Khar – July 18, 2015; August 19; September 4
Hnan Ywa – July 16, 2015; August 19; September 4
Hpet Taw – July 17, 2015; August 19; September 3
Nyaung Kan – July 17, 2015; August 19; September 5
Gyoke Pin – July 19, 2015; August 18; September 5
Thien Ywa – July 18, 2015; August 18; September 5
Tha Pyay Thar – July 19, 2015; August 18; September 2

IFC documents note that the main concerns brought up during these consultations were: employment, availability and quality of surface and ground water, access to electricity, air emissions and health implications, and noise. Villagers in Sa Khar were particularly concerned because heat generated from the adjacent steel mill killed their crops and made their land inviable. According to project documents, “[t]his concern has been fed into the design of the Project - due to the height of the stacks on site it is not anticipated that there will be any significant heat discharged and noise management measures will be put in place.”

The following three villages will also be engaged moving forward: Ayea, Hla Nuang Tang, and Kaing Taung. According to the Stakeholder Engagement document, during construction villagers will receive monthly “progress updates via information distributed to the village tract leaders and/ or the relevant committee representative”; quarterly “progress updates via a face-to-face meeting”; and, as required, villagers will give “input on relevant management plans” and receive “notification in advance of undertaking noisy activities” and “transportation of heavy machinery.”

PUBLIC INFORMATION AND DISCLOSURE POLICY OF AIIB
As noted above, this project was disclosed by AIIB several days before the board considered the project. Groups, such as NGO Forum on ADB, have raised alarm over the adequacy of notice and consultation on the part of AIIB. Based on AIIB’s Public Information Interim Policy, the public has the right to access information. Such information on AIIB’s policies and decision-making determines the public’s participation and ultimately on environmental and social sustainability and safeguards. Project information requests may be made to the AIIB at: projects@aiib.org.

PROJECT-LEVEL GRIEVANCE MECHANISMS
According to IFC documents, the borrowing client, Sembcorp, will create a project-level grievance mechanism in order to engage with community members. Additionally, the IFC’s Stakeholder Engagement document states that “[a] variety of methods will be available through which stakeholders can lodge grievances. This will include: Face-to-face meetings with the member of the committee, the [community liaison officer] or other relevant Project representative; Written communication (e.g. email, letter) directed to a committee member, a [community liaison officer] or other relevant Project representative or left in a feedback box, which will be located in each village and at the Myingyan and Taung Thar GAD offices. Villagers may choose to speak to their village tract leader or committee representative to help facilitate a written complaint; and Telephone call placed to a committee member, the [community liaison officer] or other relevant Project representative.”

IFC COMPLIANCE ADVISOR/OMBUDSMAN
The Compliance Advisor Ombudsman (CAO) is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by an IFC-financed project. If you submit a complaint to the CAO, they may assist you in resolving a dispute with the company and/or investigate to assess whether the IFC is following its own policies and procedures for preventing harm to people or the environment. You can learn more about the CAO and how to file a complaint at http://www.cao-ombudsman.org/

AIIB OVERSIGHT MECHANISM

The AIIB has established the Accountability Mechanism for Project-Affected People (PPM).  The PPM provides “an opportunity for an independent and impartial review of submissions from Project-affected people who believe they have been or are likely to be adversely affected by AIIB’s failure to implement the ESP in situations when their concerns cannot be addressed satisfactorily through Project level GRMs or AIIB Management processes.” Two or more project-affected people can file a complaint.  Under the current AIIB policy, when the bank co-finances a project with another development bank, it may apply the other bank's standards. You can refer to the Project Summary Information document to find out which standards apply.  You can learn more about the PPM and how to file a complaint at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/how-we-assist-you/index.html.

The complaint submission form can be accessed in Arabic, Bahasa Indonesia, Bengali, Chinese, English, Tagalog, Hindi, Nepali, Russian, Turkish, or Urdu. The submission form can be found at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/submission/index.html.

How it works

How it works