According to bank website, the project will be developed by Shapoorji Pallonji Infrastructure Capital Company Private Limited through Nutan Bidyut (Bangladesh) Limited (NBBL), a special purpose vehicle incorporated in Bangladesh for the sole purpose of developing and operating the project.
The 220 MW power plant will include two gas turbine generators, two heat recovery steam generators and one steam turbine generator along with the balance of the plant, including facilities for fuel gas transportation, compression and conditioning system, high-speed diesel storage, cooling water system and water treatment facility. Power will be evacuated through the proposed gas insulated switchyard of the proposed plant to the existing 230 kV air insulated switchyard to Barisal substation through the existing 230 kV transmission line. A gas pipeline of around 5 kilometers from the Shahbazpur gas field to the project site alongside the existing pipeline will be constructed.
Alok Dayal
Senior Portfolio Monitoring Specialist
Jagannath Sinhamahapatra
Director
Nutan Bidyut (Bangladesh) Limited
The People’s Republic of Bangladesh
j.sinhamahapatra@nutanbidyut.com
ACCOUNTABILITY MECHANISM OF AIIB
In addition, the AIIB has a Bank Oversight Mechanism. According to AIIB's policies, "people who believe they have been or are likely to be adversely affected by a failure of the Bank to implement the ESP may also submit complaints to the Bank's oversight mechanism in accordance with the policies and procedures to be established by the Bank for such mechanism." However, at the time of writing, it is unclear what the exact scope and function of this Oversight Mechanism will be.