Azerbaijan : Capacity Building for Railway Project Preparation and Implementation (ADB-59145-001)

Countries
  • Azerbaijan
Geographic location where the impacts of the investment may be experienced.
Specific Location
Birjari (Baku)-Yalama and Baku-Boyuk Kasic
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • Asian Development Bank (ADB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Approved
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
U
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Jun 11, 2025
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Government of Azerbaijan - Azerbaijan Railways Closed Joint Stock Company
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Technical Cooperation
  • Transport
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Grant
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 0.22 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Project Cost (USD)
$ 0.22 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ ADB website

Updated in EWS Nov 11, 2025


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to the Bank’s website, the Azerbaijan Railways Closed Joint Stock Company (ADY) requested ADB for assistance to undertake a review of the documentation and cost estimations, assessing the appropriateness of systems, completeness of design specifications and overall suitability of the projects on electrification, signaling and telecommunications and the preparation of bid documents.

In January 2025, Azerbaijan Railways Closed Joint Stock Company (ADY) shared with ADB the feasibility study and detailed design documentation for the installation of electrification, power supply, signaling and telecommunications systems along two railway sections: Birjari (Baku)-Yalama and Baku-Boyuk Kasic. These sections are part of the country's north-south and east-west rail corridors, respectively. Initial discussions have been held between ADY and the government to seek ADB financing.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

The TA financing amount is $225,000, which will be financed on a grant basis by ADB’s Technical Assistance Special Fund.

Private Actors Description
A Private Actor is a non-governmental body or entity that is the borrower or client of a development project, which can include corporations, private equity and banks. This describes the private actors and their roles in relation to the project, when private actor information is disclosed or has been further researched.

Azerbaijan Railway Company (ADY) is the national state-owned rail transport operator in the Republic of Azerbaijan.

Private Actor 1 Private Actor 1 Role Private Actor 1 Sector Relation Private Actor 2 Private Actor 2 Role Private Actor 2 Sector
- - - - Azerbaijan Railways CSJC (ADY) Contractor -

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

No contacts available at the time of disclosure.

How it works