As stated by the ADB, Gajahmungkur Floating Solar Project: 100MWac floating solar PV plant to be built on the surface of the Gajahmungkur reservoir, Wonogiri Regency, Central Java which is currently used by a hydroelectric power plant owned by Perum Jasa Tirta I, one of the Sponsors of Gajahmungkur Floating Solar Project. The total surface area required for development is 250 hectares. The transmission line for Gajahmungkur floating solar PV plant is connected to Nguntoronadi 150 kV Substation. The distance to the nearest switchyard is approximately 11.7 kilometers from the floating PV site.
Banyuwangi Ground-Mounted Solar Project: 100MWac ground mounted solar PV plant to be built in Banyuwangi Regency, East Java. The transmission line for the Banyuwangi PV plant is connected to Banyuwangi 150 kV Substation. The distance to the nearest switchyard is approximately 4 kilometers from the PV site.
The ADB categorized the prject E&S risks as follows -
Environment: B
Involuntary Resettlement: A
Indigenous Peoples: C
As stated by Bloomberg, GCL Intelligent Energy Co., Ltd. offers provides power generation services. The Company offers electricity generation, electricity transmission, electricity distribution, power transformation, and other related services. GCL Intelligent Energy also provides heating services.
Jasa Tirta I is an Indonesian stated-owned water supply company based in Malang, East Java.
PT PLN is an Indonesian company responsible for the supply of electricity, especially in generation, transmission and distribution.
| Private Actor 1 | Private Actor 1 Role | Private Actor 1 Sector | Relation | Private Actor 2 | Private Actor 2 Role | Private Actor 2 Sector |
|---|---|---|---|---|---|---|
| GCL (Group) Holdings Co., Ltd. | Client | Energy | contracts with | Perum Jasa Tirta I | Client | Water and Sanitation |
| GCL (Group) Holdings Co., Ltd. | Client | Energy | contracts with | PT PLN Indonesia Power | Client | Energy |
| PT PLN Indonesia Power | Client | Energy | contracts with | Perum Jasa Tirta I | Client | Water and Sanitation |
ADB Team Leader:
David Dovan
Email: ddovan@adb.org
ACCESS TO INFORMATION
You can submit an information request for project information at: https://www.adb.org/forms/request-information-form
ADB has a two-stage appeals process for requesters who believe that ADB has denied their request for information in violation of its Access to Information Policy. You can learn more about filing an appeal at: https://www.adb.org/site/disclosure/appeals
ACCOUNTABILITY MECHANISM OF ADB
The Accountability Mechanism is an independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by an Asian Development Bank-financed project. If you submit a complaint to the Accountability Mechanism, they may investigate to assess whether the Asian Development Bank is following its own policies and procedures for preventing harm to people or the environment. You can learn more about the Accountability Mechanism and how to file a complaint at: http://www.adb.org/site/accountability-mechanism/main.