Chisinau Ismail Bridge rehabilitation (EBRD-57942)

Regions
  • Europe and Central Asia
Geographic location where the impacts of the investment may be experienced.
Countries
  • Moldova
Geographic location where the impacts of the investment may be experienced.
Specific Location
City of Chisinau
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • European Bank for Reconstruction and Development (EBRD)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
B
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Dec 16, 2026
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
City of Chisinau
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Infrastructure
  • Law and Government
  • Transport
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 11.26 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 10
Converted using 2026-10-02 exchange rate.
Project Cost (USD)
$ 11.26 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 10
Converted using 2026-10-02 exchange rate.
Primary Source

Original disclosure @ EBRD website

Updated in EWS Nov 10, 2026

Disclosed by Bank Oct 2, 2026


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to the Bank’s website, the Project envisages the rehabilitation of the Ismail Bridge in Chisinau, a priority investment aimed at restoring the structural integrity, safety, and operational capacity of one of the city's key transport links. Built in 1968, the bridge has deteriorated due to ageing infrastructure, heavy traffic loads, and chronic underinvestment in structural maintenance. This deterioration has resulted in escalating maintenance costs, increased traffic disruptions, heightened safety risks, and the potential need to restrict the bridge's use, with adverse impacts on the efficiency and reliability of the overall urban transport network.

The Project will restore the bridge's structural integrity, extend its service life, improve its resilience, enhance road safety, and reduce traffic congestion and travel time, contributing to greater efficiency, connectivity, and reliability within Chisinau.

The borrower will be the City of Chisinau, a municipality located in Moldova. Chisinau, the capital city of Moldova, has a population of 800,000, representing nearly one-third of the country's total population and covers an area of 571.6 square kilometres. The City is the most economically vital locality in Moldova and serves as its financial and business capital, contributing about 60 per cent of the national GDP.

Early Warning System Project Analysis
For a project with severe or irreversible impacts to local community and natural resources, the Early Warning System Team may conduct a thorough analysis regarding its potential impacts to human and environmental rights.

Categorised B (2024 Environmental and Social Policy). Key Environmental and Social ("E&S") issues to consider are Client's E&S management capacity, contractor management, occupational health and safety during construction, community Health and Safety, pollution and waste management, economic displacement and stakeholder engagement and grievance mechanism. E&S due diligence will be carried out with the support of a consultant and will include a site visit.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

The facility will consist of a sub-sovereign loan to the City in the amount of up to EUR 10.0 million to support the comprehensive rehabilitation and modernization of the Ismail Bridge.


Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

Ion Ceban
primaria@pmc.md
+373 22 22 10 02
+373 22 22 12 89
www.chisinau.md
83, Stefan cel Mare si Sfint avenue Chisinau, MD 2012 Moldova

ACCESS TO INFORMATION

You can request information by emailing: accessinfo@ebrd.com or by using this electronic form: https://www.ebrd.com/eform/information-request

ACCOUNTABILITY MECHANISM OF EBRD

The Project Complaint Mechanism (PCM) is the independent complaint mechanism and fact-finding body for people who have been or are likely to be adversely affected by an European Bank for Reconstruction and Development (EBRD)-financed project. If you submit a complaint to the PCM, it may assess compliance with EBRD's own policies and procedures to prevent harm to the environment or communities or it may assist you in resolving the problem that led to the complaint through a dialogue with those implementing the project. Additionally, the PCM has the authority to recommend a project be suspended in the event that harm is imminent.

You can contact the PCM at: pcm@ebrd.com or you can submit a complaint online using an online form at: http://www.ebrd.com/eform/pcm/complaint_form?language=en

You can learn more about the PCM and how to file a complaint at: http://www.ebrd.com/work-with-us/project-finance/project-complaint-mechanism.html

How it works

How it works