As stated on the project disclosure page, the EBRD is considering providing a loan for the construction, commissioning and operation of a 200 MW wind power project (WPP) in Egypt. The WPP will provide electricity to integrated green ammonia production facility consisting of a 100 MW electrolyser. Electricity will also be provided by a 70MW solar plant.
The ESIA disclosure package focuses on the WPP only.
1. ESIA Report
2. Stakeholder Engagement Plan
3. Non-Technical Summary (NTS)
4. Environmental and Social Action Plan (ESAP)
5. ESHS Manual
6. Cumulative Effects Assessment (CEA) Report
7. Critical Habitat Assessment (CHA) Report
8. Biodiversity Management Plan (BMP)
9. Biodiversity Action Plan (BAP)
10. Climate change risk assessment
11. Flood risk assessment
12. Migration of Soaring Birds at Gebel El Zeit (IBA) in relation to wind energy developments-SCATEC project
13. Gender and HR Risk Assessment
14. Detailed noise assessment (technical annex)
15. Shadow flicker assessment (technical annex)
https://scatec.com/sustainability/esg-resources/
Environmental or social enquiries
Contact Name: Mohammed KhairyEmail:mohammed.khairy@scatec.comWeb:https://scatec.com/sustainability/esg-resources/
General enquiries
Contact Name: Adam MarmoushEmail: adam.marmoush@scatec.comWeb:https://scatec.com/sustainability/esg-resources/
Contact Name: Raquel AraujoEmail:raquel.araujo@scatec.comWeb:https://scatec.com/sustainability/esg-resources/
Information on the investment amount not provided at the time of disclosure.
As stated by Bloomberg, Scatec ASA operates as an energy company. The Company develops, builds, owns, operates and maintains solar, hydro, and wind power plants that generate clean and reliable electricity. Scatec serves customers worldwide.
Private Actor 1 | Private Actor 1 Role | Private Actor 1 Sector | Relation | Private Actor 2 | Private Actor 2 Role | Private Actor 2 Sector |
---|---|---|---|---|---|---|
- | - | - | - | Scatec ASA | Client | Energy |
Full ESIA documentation is available locally at:
Ras Ghareb Local Governmental Unit
Ras Ghareb City Council Offices
Al-Mina Street, 11432 Ras Ghareb - Red Sea, Egypt
Phone: +20 1001318480 / +20 1201958777
Project office: Building 44, The Northern 90th street, banks center, New Cairo, Cairo
EBRD Resident Office in Cairo
EGID Building, First Floor, Block 72, off Ninety Axis, 5th Settlement, New Cairo, Cairo, Egypt
Client - Scatec ASA:
Website: https://scatec.com/sustainability/esg-resources/
Environmental or social enquiries -
Mohammed Khairy
Email: mohammed.khairy@scatec.com
General enquries -
Adam Marmoush
Email: adam.marmoush@scatec.com
Raquel Araujo
Email: raquel.araujo@scatec.com
ACCESS TO INFORMATION
You can request information by emailing: accessinfo@ebrd.com or by using this electronic form: https://www.ebrd.com/eform/information-request
ACCOUNTABILITY MECHANISM OF EBRD
The Project Complaint Mechanism (PCM) is the independent complaint mechanism and fact-finding body for people who have been or are likely to be adversely affected by an European Bank for Reconstruction and Development (EBRD)-financed project. If you submit a complaint to the PCM, it may assess compliance with EBRD's own policies and procedures to prevent harm to the environment or communities or it may assist you in resolving the problem that led to the complaint through a dialogue with those implementing the project. Additionally, the PCM has the authority to recommend a project be suspended in the event that harm is imminent.
You can contact the PCM at: pcm@ebrd.com or you can submit a complaint online using an online form at: http://www.ebrd.com/eform/pcm/complaint_form?language=en
You can learn more about the PCM and how to file a complaint at: http://www.ebrd.com/work-with-us/project-finance/project-complaint-mechanism.html