Baseload Renewable Mauritania (IFC-51829)

Countries
  • Mauritania
Geographic location where the impacts of the investment may be experienced.
Financial Institutions
  • International Finance Corporation (IFC)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
B
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Nov 30, 2026
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Istithmar Green Energy S.A.
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Construction
  • Energy
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 53.63 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 48
Converted using 2026-10-26 exchange rate.
Project Cost (USD)
$ 220.12 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 197
Converted using 2026-10-26 exchange rate.
Primary Source

Original disclosure @ IFC website

Updated in EWS Nov 24, 2026

Disclosed by Bank Oct 26, 2026


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to bank provided information, this project supports the development of one of Mauritania's first utility-scale grid-connected solar PV Independent Power Producer (IPP) facilities integrated with a large-scale battery energy storage system (BESS). IFC is providing a 12-year EUR financing package alongside concessional funding to increase electricity supply reliability, diversify the power mix away from fossil fuels, and advance national electrification goals.

 

Istithmar West Africa (IWA or the Company), through a project company, is developing a hybrid renewable energy complex in Toujounine, Nouakchott-Nord, Mauritania, under a 15-year public-private partnership (PPP) with the Government of Mauritania. IWA was selected as preferred bidder in a restricted tender in July 2025. The PPP supports the emergency plan to close the short-term generation capacity deficit identified in the 2022 Generation–Transmission Master Plan. The complex will be built in two phases on a single site of 1,032 ha, with total installed capacity of about 228 MW.

Phase I (the Project) comprises: (i) a 168 MWp solar PV plant; (ii) a 185 MW/370 MWh battery energy storage system (BESS); (iii) a 33/225 kV substation and an approximately 350 m 225 kV overhead line connecting to the SOMELEC grid; and (iv) an approximately 2 km access road from the Rocade ring road. The Project is designed to deliver: (i) a guaranteed minimum output of 60 MW between 09:00 and 17:00, achieved by smoothing PV variability and managing ramp rates; and (ii) evening dispatchable reserve: 60 MW for four hours between 19:00 and 23:00.

Phase 2 (the Wind Development), which is not part of this round of IFC financing, comprises a 60 MW wind farm of twelve 5 MW wind turbine generators (WTGs), connected to the Phase I substation through an underground 33 kV collector network. Phase 2 will improve evening supply and optimize overall production cost.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Project cost (Phase I) is estimated to be EUR [197] million. IFC intends to provide an A loan of up to EUR [48] million and mobilize EUR [23] million equivalent from Banque Populaire de Mauritanie (BPM) in local currency.

Private Actors Description
A Private Actor is a non-governmental body or entity that is the borrower or client of a development project, which can include corporations, private equity and banks. This describes the private actors and their roles in relation to the project, when private actor information is disclosed or has been further researched.

 

The Project Company is Istithmar Green Energy S.A., a Special Purpose Vehicle (“SPV”) incorporated in Mauritania.  IWA owns 100% the SPV’s shares.

IWA is a Mauritanian conglomerate and diversified industrial and investment group with operations primarily in West Africa. Its activities span four core sectors—energy, industry, agri-food, and mining—and it has an established presence across six African countries. IWA has developed and operated two independent power producer (IPP) projects: one in Guinea, comprising three thermal power plants totaling 100 MW under a BOOT model, and one in Niger, comprising two thermal power plants—89 MW in Niamey and 22 MW in Zinder.

Private Actor 1 Private Actor 1 Role Private Actor 1 Sector Relation Private Actor 2 Private Actor 2 Role Private Actor 2 Sector
- - - - Ististmar West Africa Parent Company -

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

 

For Inquiries About the Project, Contact

Istithmar West Africa (IWA)
Abderrahmane Kane
Fundraising CEO’s Advisor
+222 36306932
k.abderrahmane@iwafrica.com
Tevragh Zeina, Batiment N°O 107B Mod. NOT, Nouackchott, Mauritania
Websitehttps://www.iwafrica.com/accueil/
 

Local Access of Project Documentation

Istithmar Green Energy (IGE)

NOT lot 107B Tevragh Zeina, Nouakchott, Mauritanie

Nouackchott, Mauritania

ACCESS TO INFORMATION

You can submit a request for information disclosure at: https://disclosures.ifc.org/#/inquiries

If you believe that your request for information from IFC has been unreasonably denied, or that this Policy has been interpreted incorrectly, you can submit a complaint at the link above to IFC's Access to Information Policy Advisor, who reports directly to IFC's Executive Vice President.

ACCOUNTABILITY MECHANISM OF IFC/MIGA

The Compliance Advisor Ombudsman (CAO) is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by an IFC or MIGA- financed project. If you submit a complaint to the CAO, they may assist you in resolving a dispute with the company and/or investigate to assess whether the IFC is following its own policies and procedures for preventing harm to people or the environment. If you want to submit a complaint electronically, you can email the CAO at CAO@worldbankgroup.org You can learn more about the CAO and how to file a complaint at http://www.cao-ombudsman.org

How it works

How it works