Marsabit District in northern Kenya
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • African Development Bank (AFDB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Completed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
U
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Apr 26, 2013
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Lake Turkana Wind Power Ltd
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 142.86 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Loan Amount (USD)
$ 142.86 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Project Cost (USD)
$ 862.11 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 625
Converted using 2014-04-01 exchange rate.
Primary Source

Original disclosure @ AFDB website

Updated in EWS Oct 2, 2025


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

As stated by the AfDB, the Lake Turkana Wind Power Project (LTWP) is of significant strategic benefit to Kenya, and one of the largest private investments in Kenya’s history. It aims to provide 300MW of reliable, low cost wind energy to the national grid, equivalent to over 20% of the current installed electricity generating capacity. The wind farm site is located in Marsabit District in northern Kenya, approximately 50km north of South Horr Township and 8km east of Lake Turkana. The project will comprise a wind farm, associated overhead electric grid collection system and a high voltage switchyard. The project also includes rehabilitation of the existing road from Laisamis to the wind farm site, a distance of approximately 200km, as well as plant and equipment lay-down areas, and access road network in and around the site for construction, operations and maintenance purposes.

The major aim of the project is to substitute a generation of clean and low cost energy from more expensive plants operating on imported diesel and fuel oil, increase employment of local labor during the construction phase, and upgrade the rural road network, significantly improving access to markets and business opportunities for the local communities, and consequently catalyzing additional jobs and income-generation opportunities in this poor and remote area. The project’s Corporate Social Responsibility Program will support investments in the local health facilities, potable water supply and school buildings. Building on its integrated approach to infrastructure development, the Bank’s ultimate aim is to establish Kenya in particular and East Africa in general, as an ideal place for business and investment through adequate energy supply capabilities.

As stated on the company's website, LTWP is connected to the Kenyan national grid through a 438km associated transmission line constructed by the Government of Kenya through the Kenya Transmission Company (KETRACO).

LTWP provides reliable, low-cost energy to Kenya’s national grid – approximately 17% of the country’s installed capacity, to be bought at a fixed price by The Kenya Power and Lighting Company PLC (Kenya Power) over a 20-year period in accordance with the Power Purchase Agreement (PPA).

Investment Description
Here you can find a list of individual development financial institutions that finance the project.
Private Actors Description
A Private Actor is a non-governmental body or entity that is the borrower or client of a development project, which can include corporations, private equity and banks. This describes the private actors and their roles in relation to the project, when private actor information is disclosed or has been further researched.

As stated on the company's website (consulted on August 21, 2025), four shareholders own LTWP, namely: Anergi Turkana Investments Limited, Osprey Renewables Africa, CFP UK Holdings Limited and Sandpiper Ltd.

Private Actor 1 Private Actor 1 Role Private Actor 1 Sector Relation Private Actor 2 Private Actor 2 Role Private Actor 2 Sector
- - - - Lake Turkana Wind Power Client -

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

AfDB Team Leader:

Manners Chuma
Email: m.chuma@afdb.org 

ACCESS TO INFORMATION

You can submit an information request for project information at: https://www.afdb.org/en/disclosure-and-access-to-information/request-for-documents. Under the AfDBÕs Disclosure and Access to Information policy, if you feel the Bank has omitted to publish information or your request for information is unreasonably denied, you can file an appeal at https://www.afdb.org/en/disclosure-and-access-to-information/appeals-process.

ACCOUNTABILITY MECHANISM OF AfDB

The Independent Review Mechanism (IRM), which is administered by the Compliance Review and Mediation Unit (CRMU), is the independent complaint mechanism and fact-finding body for people who have been or are likely to be adversely affected by an African Development Bank (AfDB)-financed project. If you submit a complaint to the IRM, it may assist you by either seeking to address your problems by facilitating a dispute resolution dialogue between you and those implementing the project and/or investigating whether the AfDB complied with its policies to prevent environmental and social harms. You can submit a complaint electronically by emailing crmuinfo@afdb.org, b.kargougou@afdb.org, b.fall@afdb.org, and/or s.toure@afdb.org. You can learn more about the IRM and how to file a complaint at: https://www.afdb.org/en/independent-review-mechanism/

How it works

How it works