FRV Solar Jordan (IFC-36877)

Countries
  • Jordan
Geographic location where the impacts of the investment may be experienced.
Financial Institutions
  • International Finance Corporation (IFC)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Active
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
B
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
May 13, 2016
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
FRV Solar Holdings IX BV/Jordan
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 95.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Project Cost (USD)
$ 72.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ IFC website

Updated in EWS Sep 23, 2017

Disclosed by Bank Jan 14, 2016


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.
Fotowatio Renewable Ventures Solar Holdings IX (FRV or the "developer"), an indirect subsidiary of Fotowatio Renewable Ventures BV, has been granted an approval by the Government of Jordan (GoJ) through the Ministry of Energy and Mineral Resources (MEMR) to develop a 50 megawatt (MW) solar photovoltaic (PV) power plant- the Jordan One project (the "project"). The project is part of the GoJ's Renewable Energy Program, which aims to increase renewable energy contribution to 10 percent of the country's generation mix by 2020. The project cost is estimated at US$ 95 million and the proposed IFC investment is up to US$72 million comprising a US$24 million A-Loan, a concessional senior loan of up to the same amount from the IFC Canada Climate Change Program and mobilization of up to US$24 million.The project will be located in the Al-Mafraq governorate, which lies approximately 68 kilometers (km) north of the Jordanian capital, Amman. It occupies a 140-hectare plot located within the 2100-hectare King Hussein Bin Talal Development Area (KHBTDA) for which Mafraq Development Corporation (MDC) is the master developer as mandated by the GoJ. The MDC area was set up in 2007 to promote private sector investment. The KHBTDA is located in the Al-Badyeah Al-Shamalyah municipality of the Al-Mafraq governorate, and the land was previously managed by the army as part of the Mafraq military air force airport lands. The airport is located less than 1 km to the west of the project. The project will be one of three 50 MW solar projects within the designated solar development park at the KHBTDA. All of the three sites are greenfield, and none have begun construction.The project also comprises the construction of a 5 km underground 33 kilovolt (kV) transmission line connecting the project to the National Electric Power Company (NEPCO) substation located within the MDC land. All output generated by the project will be sold to NEPCO under a 20-year Power Purchase Agreement (PPA) to be signed in January 2016. The transmission line right-of-way (ROW) will follow the route of the MDC roads and be installed by FRV.The project will consist of a total of approximately 205,000 PV panels with a nominal capacity of 50 MW AC and a peak capacity of 65 MW DC. Power will be sent to an inverter, which will then be fed into the utility power grid system through the NEPCO substation. The Transmission Connection Agreement (TCA) was signed with NEPCO in 2015. Project procurement and construction will take place between the third quarter of 2016 and the third quarter of 2017, and the plant will be operational for a 20-year period, with options to extend the lease after that date. There will be one Engineering, Procurement and Construction (EPC) contractor and Operations and Maintenance (O&M) provider (the same entity), which has not yet been selected. MDC will provide the project with access roads, a combined water and firefighting network, and wastewater services, which are under development.The project is located approximately 5.8 km from the city of Al-Mafraq, and approximately 8 km from the Syrian border. The nearest communities are the villages of Al-Zbaidiyah 1 km to the north, Al-Zatary 2.7 km to the southeast and Al-Ba'ej 3 km to the northeast. The area is flat, and the only topographic features are a number of minor ditches and depressions that collect rainwater during the winter rains, with any rains ultimately flowing to the wadi Al-Zaatari. Although vegetation is very sparse and not ideal for grazing or agriculture, some local herders do pass through the project area with their flocks; other than this short term transient use, the land is currently unused.The Zaatari Syrian refugee camp is located approximately 5.4 km southeast of the project; the camp population is currently estimated at 79,000 refugees.
Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.
Company Contact Information Shalabh Arora Fotowatio Renewable Ventures 23rd Floor, Jumeirah Business Centre, Unit 2304, Custer G, PO Box 392632, Jumeirah Lakes Towers, Dubai, UAE, Email: mailto:shalabh.arora@frv.com Phone: +971 4 375 8554 Accountability Mechanism of the IFC The Compliance Advisor Ombudsman (CAO) is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by an IFC or MIGA- financed project. If you submit a complaint to the CAO, they may assist you in resolving a dispute with the company and/or investigate to assess whether the IFC is following its own policies and procedures for preventing harm to people or the environment. If you want to submit a complaint electronically, you can email the CAO at CAO@worldbankgroup.org. You can learn more about the CAO and how to file a complaint at http://www.cao-ombudsman.org/

How it works

How it works