S74 EXPRESSWAY SULEJOW - OPATOW (EIB-20250139)

Countries
  • Poland
Geographic location where the impacts of the investment may be experienced.
Specific Location
Sulejów to Tomaszów
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • European Investment Bank (EIB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Approved
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
U
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Voting Date
Jul 16, 2025
Date when project documentation and funding is reviewed by the Board for consideration and approval. Some development banks will state a "board date" or "decision date." When funding approval is obtained, the legal documents are accepted and signed, the implementation phase begins.
Borrower
Government of Poland - Ministry of Infrastructure; GDDKIA
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Law and Government
  • Transport
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 698.13 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 600
Converted using 2025-07-16 exchange rate.
Project Cost (USD)
$ 1,758.13 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 1511
Converted using 2025-07-16 exchange rate.
Primary Source

Original disclosure @ EIB website

Updated in EWS Jul 19, 2025

Disclosed by Bank Mar 7, 2025


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to the Bank’s website, the project concerns the construction of a 97.2 km long S74 expressway on two non-continuous sections between Sulejów and Tomaszów and a 14 km bypass of Opatów.

The design foresees the construction of a primary "greenfield" 2x2 lane expressway, mostly along a new alignment. Additionally, the project scope includes the construction of 15 grade separated interchanges, advanced drainage systems, noise protection screens, over 200 animal crossings, connections to local and service roads, 8 expressway service areas and an expressway maintenance centre.

The aim is to contribute to improve accessibility by adapting the technical and operational parameters of the road to the forecast traffic level and by removing bottlenecks on the existing links.
The new S74 expressway will not only improve connectivity in the region but will also contribute to more efficient international traffic flow organisation and driving conditions on the comprehensive Trans-European Transport Network (TEN-T) road corridor.

Early Warning System Project Analysis
For a project with severe or irreversible impacts to local community and natural resources, the Early Warning System Team may conduct a thorough analysis regarding its potential impacts to human and environmental rights.

Based on the conclusions from the EIA studies, the Competent Authorities have issued five Environmental Decisions for different project sections. Following the design stage, six second stage supplemental EIA (SEIA) studies were/are being undertaken to apply for a construction permit (ZRID). Construction permits for two contracts have been granted. According to a preliminary analysis, the project alignment directly intersects with two NATURA 2000 sites - PLH 260015 Dolina Czarnej and PLH260014 Dolina Bobrzy. It also runs nearby several other NATURA 2000 sites. The compliance to the requirements of the Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified in more detail during the appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation. Potential climate risks, the scope and adequacy of the applied adaptation measures for ensuring long-term resilience of the new road, and impact of the project implementation on the GHG emissions will be further assessed during the appraisal. One of the project's objectives is to divert heavy traffic, thereby improving living conditions and safety in Kielce and Opatow as well as the local communities along the national roads DK74 and DK9.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.
Private Actors Description
A Private Actor is a non-governmental body or entity that is the borrower or client of a development project, which can include corporations, private equity and banks. This describes the private actors and their roles in relation to the project, when private actor information is disclosed or has been further researched.

The General Directorate for National Roads and Motorways (GDDKiA) is the central authority of national administration set up to manage the national roads and implementation of the state budget in Poland. The GDDKiA was established on 1 April 2002 by the Polish Ministry of Transportation.


Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

No contacts available at the time of disclosure.

ACCESS TO INFORMATION

You can submit an information request for project information at: https://www.eib.org/en/infocentre/registers/request-form/request-form-default.htm

ACCOUNTABILITY MECHANISM OF EIB

The EIB Complaints Mechanism is designed to facilitate and handle complaints against the EIB by individuals, organizations or corporations affected by EIB activities. When exercising the right to lodge a complaint against the EIB, any member of the public has access to a two-tier procedure, one internal - the Complaints Mechanism Office - and one external - the European Ombudsman. A complaint can be lodged via a written communication addressed to the Secretary General of the EIB, via email to the dedicated email address: complaints@eib.org, by completing the online complaint form available at the following address: http://www.eib.org/complaints/form via fax or delivered directly to the EIB Complaints Mechanism Division, any EIB local representation office or any EIB staff. For further details, check: http://www.eib.org/attachments/strategies/complaints_mechanism_policy_en.pdf

When dissatisfied with a complaint to the EIB Complaints Mechanism, citizens can then turn towards the European Ombudsman. A memorandum of Understanding has been signed between the EIB and the European Ombudsman establishes that citizens (even outside of the EU if the Ombudsman finds their complaint justified) can turn towards the Ombudsman on issues related to 'maladministration' by the EIB. Note that before going to the Ombudsman, an attempt must be made to resolve the case by contacting the EIB. In addition, the complaint must be made within two years of the date when the facts on which your complaint is based became known to you. You can write to the Ombudsman in any of the languages of the European Union. Additional details, including filing requirements and complaint forms, are available at: http://www.ombudsman.europa.eu/atyourservice/interactiveguide.faces

How it works

How it works