SECOND INTERCONNECTOR MALTA SICILIA (EIB-20230582)

Regions
  • Europe and Central Asia
Geographic location where the impacts of the investment may be experienced.
Countries
  • Malta
Geographic location where the impacts of the investment may be experienced.
Specific Location
Maghtab (Malta) and Ragusa (Sicily, Italy)
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • European Investment Bank (EIB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
U
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Borrower
Government of Malta
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
  • Infrastructure
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 184.47 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported 171
Converted using 2025-03-06 exchange rate.
Loan Amount (USD)
$ 184.47 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported EUR 171 million
Converted using 2025-03-06 exchange rate.
Project Cost (USD)
$ 323.62 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Currency conversion note:
Bank reported EUR 300 million
Converted using 2025-03-06 exchange rate.
Primary Source

Original disclosure @ EIB website

Updated in EWS Mar 8, 2025

Disclosed by Bank Mar 6, 2025


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

As stated by the EIB, the project will finance the construction of a new high-voltage electrical subsea cable interconnection between Maghtab in Malta and Ragusa in Sicily. The cable will have an approximate length of 122 km, a capacity of 225 MW, and a nominal voltage of 220 kV.

The project has undergone an EIA assessment both in Malta and Italy. In Malta, the EIA was approved in August 2023, and the development permit was issued in January 2024. In Italy, the permitting process began with the submission of the application in August 2023, granting a Construction and Operation permit on 18th December 2024. Screening approval was granted by Regione Sicilia in August 2024, and the public consultation concluded positively in October 2024.

The Project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation.

The new cable will operate in parallel with the existing one connected to the same substations in Malta and Italy.

Early Warning System Project Analysis
For a project with severe or irreversible impacts to local community and natural resources, the Early Warning System Team may conduct a thorough analysis regarding its potential impacts to human and environmental rights.

As stated by the EIB, typical impacts that can be expected for the project on both terrestrial and marine environment include habitat damage or loss, noise, chemical pollution, heat and electric field emissions. The most significant impacts that have been identified are during implementation, they are limited and mostly reversible.

The permit and the underlying EIA studies confirm that, subject to the implementation of the specified mitigating measures, the project would neither have significant adverse effects on the environment nor adversely affect the integrity of any European site in relation to the site's conservation objectives.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

No project contacts provided at the time of disclosure.

ACCESS TO INFORMATION

You can submit an information request for project information at: https://www.eib.org/en/infocentre/registers/request-form/request-form-default.htm

ACCOUNTABILITY MECHANISM OF EIB

The EIB Complaints Mechanism is designed to facilitate and handle complaints against the EIB by individuals, organizations or corporations affected by EIB activities. When exercising the right to lodge a complaint against the EIB, any member of the public has access to a two-tier procedure, one internal - the Complaints Mechanism Office - and one external - the European Ombudsman. A complaint can be lodged via a written communication addressed to the Secretary General of the EIB, via email to the dedicated email address: complaints@eib.org, by completing the online complaint form available at the following address: http://www.eib.org/complaints/form via fax or delivered directly to the EIB Complaints Mechanism Division, any EIB local representation office or any EIB staff. For further details, check: http://www.eib.org/attachments/strategies/complaints_mechanism_policy_en.pdf

When dissatisfied with a complaint to the EIB Complaints Mechanism, citizens can then turn towards the European Ombudsman. A memorandum of Understanding has been signed between the EIB and the European Ombudsman establishes that citizens (even outside of the EU if the Ombudsman finds their complaint justified) can turn towards the Ombudsman on issues related to 'maladministration' by the EIB. Note that before going to the Ombudsman, an attempt must be made to resolve the case by contacting the EIB. In addition, the complaint must be made within two years of the date when the facts on which your complaint is based became known to you. You can write to the Ombudsman in any of the languages of the European Union. Additional details, including filing requirements and complaint forms, are available at: http://www.ombudsman.europa.eu/atyourservice/interactiveguide.faces

How it works

How it works