As stated by the EIB, the project concerns the implementation of a High-Voltage Direct Current (HVDC) link interconnecting France and Spain across the Biscay Bay. The project will have a rated capacity of 2000 MW, DC voltage of 400 kV and a total route length of circa 390 km.
The project will expand the electricity interconnection between Spain and France, thereby improving the integration of the EU electricity market and the operation of renewable power generation in both countries, and more widely between the Iberian Peninsula and the rest of Europe.
The Bay of Biscay interconnection is classified by the EU as a Project of Common Interest or PCI, and is being delivered by Inelfe a joint venture between Red Eléctrica and Réseau transport d’électricité. It is co-funded by a Connecting Europe Facility (CEF) grant of €578 million.
The connection will link two alternating current systems via a submarine direct current line. At each end of the connection, stations in Cubnezais in France and Gatika in Spain will convert the direct current into alternating current for connection to the transmission grids of Spain and France.
As stated by Bloomberg, Interconnexion Electrique France Espagne (INELFE) provides energy services. The Company develops new electrical interconnection projects to increase electrical quality and security. INELFE serves customers in France and Spain.
Inelfe is a joint venture between Red Eléctrica and Réseau transport d’électricité.
As stated by the EIB:
Red Eléctrica
Red Eléctrica is the transmission system operator (TSO) for the Spanish electricity system and Redeia’s flagship. Since 1985, Red Eléctrica guarantee the security of supply in Spain, driving its social and economic development. Now, the company is also the backbone of the energy transition in the country.
Réseau Transport d’Électricité
The French electricity-transmission-system operator, RTE, provides a public service: guaranteeing a constant supply of electricity throughout France, with the same standard of service, thanks to the efforts of its 10,025-strong staff. RTE manages electricity flows, balancing production and consumption in real time. RTE maintains and develops the high and very-high voltage grid (from 63,000 to 400,000 volts) which includes nearly 100,000 kilometres of overhead lines, 7,000 kilometres of underground lines, 2,900 operational substations, some jointly operated, and around fifty cross-border lines. With 37 interconnections with neighbouring countries, the French grid is the largest in Europe. RTE is an independent and neutral industrial operator of the energy transition, optimising and transforming its grid to connect new consumers and low-carbon electricity generation facilities.
Private Actor 1 | Private Actor 1 Role | Private Actor 1 Sector | Relation | Private Actor 2 | Private Actor 2 Role | Private Actor 2 Sector |
---|---|---|---|---|---|---|
- | - | - | - | Interconnexion Electrique France Espagne SAS (INELFE) | Client | Energy |
RTE Reseau de Transport d'Electricite SADIR | Parent Company | Energy | contracts with | Red Eléctrica de España | Parent Company | Energy |
No project contacts provided at the time of disclosure.
ACCESS TO INFORMATION
You can submit an information request for project information at: https://www.eib.org/en/infocentre/registers/request-form/request-form-default.htm
ACCOUNTABILITY MECHANISM OF EIB
The EIB Complaints Mechanism is designed to facilitate and handle complaints against the EIB by individuals, organizations or corporations affected by EIB activities. When exercising the right to lodge a complaint against the EIB, any member of the public has access to a two-tier procedure, one internal - the Complaints Mechanism Office - and one external - the European Ombudsman. A complaint can be lodged via a written communication addressed to the Secretary General of the EIB, via email to the dedicated email address: complaints@eib.org, by completing the online complaint form available at the following address: http://www.eib.org/complaints/form via fax or delivered directly to the EIB Complaints Mechanism Division, any EIB local representation office or any EIB staff. For further details, check: http://www.eib.org/attachments/strategies/complaints_mechanism_policy_en.pdf
When dissatisfied with a complaint to the EIB Complaints Mechanism, citizens can then turn towards the European Ombudsman. A memorandum of Understanding has been signed between the EIB and the European Ombudsman establishes that citizens (even outside of the EU if the Ombudsman finds their complaint justified) can turn towards the Ombudsman on issues related to 'maladministration' by the EIB. Note that before going to the Ombudsman, an attempt must be made to resolve the case by contacting the EIB. In addition, the complaint must be made within two years of the date when the facts on which your complaint is based became known to you. You can write to the Ombudsman in any of the languages of the European Union. Additional details, including filing requirements and complaint forms, are available at: http://www.ombudsman.europa.eu/atyourservice/interactiveguide.faces