Konexa NBP2 and Solar Project (MIGA-15488)

Regions
  • Africa
Geographic location where the impacts of the investment may be experienced.
Countries
  • Nigeria
Geographic location where the impacts of the investment may be experienced.
Specific Location
Enugu, Lagos; Gurara Local Government Area, Niger State
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Financial Institutions
  • Multilateral Investment Guarantee Agency (MIGA)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Bank Risk Rating
B
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Borrower
Konexa Power Holdings PCC
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Energy
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Guarantee
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 74.30 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Other Related Projects
Primary Source

Original disclosure @ MIGA website

Updated in EWS Oct 15, 2026

Disclosed by Bank Dec 22, 2025


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

As stated on the project disclosure page, MIGA has been asked to provide a guarantee for a period of up to 15-19 years to cover Equity, Quasi-equity, and Shareholder loan investments provided by Konexa Power Holdings PCC of Mauritius ("Konexa", the Guarantee Holder (GH)) for the development, operation and maintenance of the new subprojects in Nigeria. Konexa is a repeat MIGA client. MIGA received Board approval in June 2022 and amendment approval in May 2023 to issue up to US$45 million of guarantees to the GH to cover its investments in Commercial and Industrial (C&I) projects and the Off-Grid project against the risks of expropriation and war and civil disturbance. The first Contract of Guarantee (CoG) was issued in February 2024 for the C&I project located in Kaduna (NBP1 Project).

The Konexa Project now comprises two new Project Enterprises (PEs): KONEXA NBP 2 LIMITED and KONEXA SOLAR 2 LIMITED. The term "Project" is used to collectively refer to these PEs and their subprojects. This ESRS focuses exclusively on these new PEs and subprojects and does not cover the existing NBP1 Project in Kaduna State, which was previously disclosed in December 2021 and March 2024.

C&I project in Enugu (NBP2 Project-Enugu)

The NBP2 Project-Enugu involves the ownership, financing, construction, operation, and maintenance of distributed energy and storage systems to be installed within Nigerian Breweries (NB) premises at Amaeke Ngwo, Udi Local Government Area, Enugu State. These systems include transformers, switchgear, metering, double inverter, Battery Energy Storage System (BESS), ring main units, and other associated equipment and buildings. It also covers the financing, construction, rehabilitation, upgrade, extension, operation, and maintenance of new and existing electricity lines, substations, and other related interconnection infrastructure. Grid connections will be made with a planned 19.42 km 33kV overhead electricity line originating from the Transmission Company of Nigeria (TCN) New Haven transmission substation, to supply energy to the NB premises at Ama, Udi Local Government Area, Enugu. A dedicated substation, BESS, and Uninterruptible Power Supply (UPS) will be constructed for effective power integration and internal distribution with the NB Ama Plant.

C&I project in Lagos (NBP2 Project-Lagos)

The NBP2 Project-Lagos shares a similar scope to the subproject in Enugu. Facilities are located at Iganmu, Surulere Local Government Area, Lagos State, and include new 33kV overhead and underground electricity lines from Akangba (2.7km) and Ijora (3.1 km) transmission substations to the Lagos plant. Within the NB Lagos premises, a site-specific storage and power management solution will be implemented, including a UPS and associated BESS.

As Konexa continues to expand its business, it will continue to add new customers and invest in additional equipment, such as more electricity lines at different voltage levels. For the existing NBP1 Project, Konexa is investing in new construction of electricity lines to a substation on the transmission system to interconnect an additional nearby customer(s) to the NBP1 Project's system in Kaduna State. Similar approaches are anticipated for the NBP2 Project in Lagos and Enugu States. These expansions are expected to have limited environmental and social (E&S) risks and impacts (no physical resettlement, no adverse impacts on sensitive or protected areas, no adverse impacts on cultural heritage sites...). MIGA will conduct the required E&S due diligence prior to these expansions.

Solar Generation (Solar Project)

This Solar Project covers the ownership, financing, construction, operation, and maintenance of about 40 MWp grid-connected solar power plant, a 6.8 MW BESS and interconnection equipment located along the Abuja-Kaduna Expressway, near the Abuja Steel Mills Limited (ASML) facility in Gurara Local Government Area, Niger State. The solar plant will feed into the national grid at the existing 132/33kV Paras Energy substation, enabling NB to claim renewable energy use. Key components include PV solar panels/modules, mounting structures, inverters, transformers, a new grid connection substation, underground and overhead electricity lines, on-site buildings (operational control center, office, security house), access roads, and ancillary infrastructure.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.
Private Actor 1 Private Actor 1 Role Private Actor 1 Sector Relation Private Actor 2 Private Actor 2 Role Private Actor 2 Sector
- - - - Konexa Power Holdings PCC Client Energy

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

ACCESS TO INFORMATION

You can submit a request for information disclosure at: https://www.miga.org/contact/access_to_information

You can also request general information about MIGA and for information on guarantees by emailing: migainquiry@worldbank.org

ACCOUNTABILITY MECHANISM OF IFC/MIGA

The Compliance Advisor Ombudsman (CAO) is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by an IFC or MIGA- financed project. If you submit a complaint to the CAO, they may assist you in resolving a dispute with the company and/or investigate to assess whether the IFC is following its own policies and procedures for preventing harm to people or the environment. If you want to submit a complaint electronically, you can email the CAO at CAO@worldbankgroup.org. You can learn more about the CAO and how to file a complaint at http://www.cao-ombudsman.org

How it works

How it works