Contribute Information
Can you contribute information about this project?
Contact the EWS Team
The proposed operation consists of the design, construction, operation, and maintenance of the Usina Termeletrica Lencois Paulista ("UTE Cidade do Livro"), an 80 megawatts ("MW") Thermal Power Plant ("TPP") fueled by biomass, using preferably wood chip or sugarcane bagasse, and a substation, as well as a 25-kilometer ("km") long 138 kilovolts ("kV") Transmission Line ("TL") to connect the TPP to the Brazilian interconnected grid at the existing Barra Bonita Substation ("The Project"). The Project will be developed in the municipality of Lencois Paulistas, Sao Paulo State, Brazil. The Project's estimated CAPEX amounts up to BRL 590 million.
IDB INVEST
ACCESS TO INFORMATION
You can submit a request for information disclosure at:
https://www.idbinvest.org/en/access-information-policy.
ACCOUNTABILITY MECHANISM OF IDB / IDB INVEST
The Independent Consultation and Investigation Mechanism (MICI) is the independent complaint mechanism and fact-finding body for people who have been or are likely to be adversely affected by an Inter-American Development Bank (IDB) or Inter-American Investment Corporation (IDB Invest)-funded project. If you submit a complaint to MICI, they may assist you in addressing the problems you raised through a dispute-resolution process with those implementing the project and/or through an investigation to assess whether the IDB or IDB Invest is following its own policies for preventing or mitigating harm to people or the environment. You can submit a complaint by sending an email to MICI@iadb.org. You can learn more about the MICI and how to file a complaint at http://www.iadb.org/en/mici/mici,1752.html (in English) or http://www.iadb.org/es/mici/mici,1752.html (Spanish).