According to bank's website, the proposed project aims to improve the quality, efficiency, safety, and climate resilience of economic growth corridors in Maharashtra and enhance institutional capacity of Maharashtra's Public Works Department to better manage its road network. The Project will have the following three components:
Component A will finance the upgrading of about 750 km of Economic Growth Corridors under PWD's Core Road Network to two-lane high-speed State Highway and Major District Road standards, as required, through improvement of geometry, road safety, climate resilience, drainage, wayside facilities, use of bio-engineering measures and green construction, as well as rehabilitation of existing and construction of new bridges, culverts, and structures. The roads will be designed mostly to two-lane carriageway with earthen/paved shoulders for a design life of 30 years, using value engineering for economic efficiency, lifecycle planning, and a 10-year in-built provision of post-construction maintenance under the works contracts, with a 5-year maintenance provision for asphalt roads.
Component B will support pilot interventions covering (i) Value Engineering: demonstration of value engineering over the project lifecycle and use of best practices on design and construction of modern two-lane highways of about 40–45 km; and (ii) RAMS Implementation: demonstration of the Road Asset Management System as a tool to optimally apply available funds through implementation of civil works (construction and maintenance) contained in the investment and maintenance plans prepared by RAMS in a typical district/sub-district, using performance-based maintenance contracts.
Component C will provide technical assistance to support implementation of initiatives under PWD's Road Sector Policy, including (i) development and operationalization of a GIS-based Road Asset Management System (RAMS) and a Long-Term Asset Management Plan; (ii) establishment and implementation of a Human Resources Professional Development Strategy for training and capacity building of PWD engineers; (iii) studies on monitoring of project development objectives and socio-economic impact assessment and contribution to the state economy; and (iv) enhancement of PWD engineering and business processes, including value engineering guidelines, a road sector financing study for PWD's Amrit Kaal Road Development Plan, a PWD-wide design policy, and a quality assurance policy similar to the PMGSY program.
Total project cost: USD 715.00 million
Proposed AIIB Financing: USD 500.00 million
Project Team Leader: Pawan Karki
Title: Senior Investment Officer
Email: pawan.karki@aiib.org
ACCESS TO INFORMATION
You can submit an information request for project information at: https://www.aiib.org/en/contact/information-request/index.html
ACCOUNTABILITY MECHANISM OF AIIB
The AIIB has established the Accountability Mechanism for Project-Affected People (PPM). The PPM provides Òan opportunity for an independent and impartial review of submissions from Project-affected people who believe they have been or are likely to be adversely affected by AIIBÕs failure to implement the ESP in situations when their concerns cannot be addressed satisfactorily through Project level GRMs or AIIB Management processes.Ó Two or more project-affected people can file a complaint. Under the current AIIB policy, when the bank co-finances a project with another development bank, it may apply the other bank's standards. You can refer to the Project Summary Information document to find out which standards apply. You can learn more about the PPM and how to file a complaint at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/how-we-assist-you/index.html
The complaint submission form can be accessed in Arabic, Bahasa Indonesia, Bengali, Chinese, English, Tagalog, Hindi, Nepali, Russian, Turkish, or Urdu. The submission form can be found at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/submission/index.html