Indonesia: Optimized Lowland Irrigation for Food Security Project (AIIB-001083)

Countries
  • Indonesia
Geographic location where the impacts of the investment may be experienced.
Financial Institutions
  • Asian Infrastructure Investment Bank (AIIB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
B
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Borrower
Republic of Indonesia, Suminto
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Agriculture and Forestry
  • Infrastructure
  • Water and Sanitation
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 200.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Loan Amount (USD)
$ 200.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ AIIB website

Updated in EWS Nov 9, 2026

Disclosed by Bank Oct 23, 2026


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to bank's website, the proposed project aims to improve the service coverage and performance of lowland irrigation systems in selected areas. It builds on past investments under the Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP), co-financed by AIIB and the World Bank and concluded in June 2025. While SIMURP invested in improving both surface/upland and lowland irrigation schemes, the proposed Project will focus on the latter. The Project is envisaged to consist of four components:

Component A: Rehabilitation and Upgrading of Irrigation Infrastructure (USD152.25 million)
aims to rehabilitate and upgrade water management infrastructure serving 108,000 ha of DIRs across Indonesia, scaling up the works initiated under SIMURP. It aims to restore the infrastructure to its original design capacity, optimize irrigation and drainage performance, and strengthen its adaptive capacity against relevant hydrometeorological hazards. Key interventions will include canal lining, embankment reinforcement, clearing/desilting of congested canals, and upgrading/expanding water regulatory structures.

Component B: Modernization of Water Management Systems (USD12.47 million)
will modernize infrastructure and hydrological monitoring networks (sensors and stations), as well as selected water control instruments. The modernized data acquisition systems will connect to real-time water monitoring centers at selected river basin organizations (B/BWS), enabling data-driven operation and maintenance (O&M) planning and implementation. It will support irrigation managers in optimizing water allocation efficiency, predicting seasonal flow fluctuations, and balancing water distribution across seasons and croplands.

Component C: Operational Sustainability Strengthening (USD23.02 million)
aims to enhance and sustain DIRs' operational performance of strengthening key stakeholders at three levels: (a) National level: strengthening the Balai Teknik Rawa (the national center of excellence in lowland management); (b) River basin level: establishing and strengthening B/BWS' in-house irrigation management units (UPIs) and upgrading their inventory of O&M equipment and machinery; and (c) Water user level: establishing and strengthening water user associations/ federations (P3A/GP3A) and engaging them in O&M activities.

Component D: Project Management (USD12.26 million)
will facilitate overall coordination, monitoring, and evaluation under the Project, including mobilizing Project Management Consultant, Technical Assistance consultants for design review/finalization, construction supervision, monitoring and evaluation (M&E), and overall project management services.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Proposed Funding Amount: US$ 200 million 


Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

Project Team Leader: David Ginting 

Title: Senior Investment Officer 

Email: david.ginting@aiib.org 

ACCESS TO INFORMATION

You can submit an information request for project information at: https://www.aiib.org/en/contact/information-request/index.html

ACCOUNTABILITY MECHANISM OF AIIB

The AIIB has established the Accountability Mechanism for Project-Affected People (PPM). The PPM provides Òan opportunity for an independent and impartial review of submissions from Project-affected people who believe they have been or are likely to be adversely affected by AIIBÕs failure to implement the ESP in situations when their concerns cannot be addressed satisfactorily through Project level GRMs or AIIB Management processes.Ó Two or more project-affected people can file a complaint. Under the current AIIB policy, when the bank co-finances a project with another development bank, it may apply the other bank's standards. You can refer to the Project Summary Information document to find out which standards apply. You can learn more about the PPM and how to file a complaint at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/how-we-assist-you/index.html

The complaint submission form can be accessed in Arabic, Bahasa Indonesia, Bengali, Chinese, English, Tagalog, Hindi, Nepali, Russian, Turkish, or Urdu. The submission form can be found at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/submission/index.html

How it works

How it works