Algeria: Central Corridor Railway Project (AIIB-001081)

Countries
  • Algeria
Geographic location where the impacts of the investment may be experienced.
Financial Institutions
  • Asian Infrastructure Investment Bank (AIIB)
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
Project Status
Proposed
Stage of the project cycle. Stages vary by development bank and can include: pending, approval, implementation, and closed or completed.
Bank Risk Rating
A
Environmental and social categorization assessed by the development bank as a measure of the planned project’s environmental and social impacts. A higher risk rating may require more due diligence to limit or avoid harm to people and the environment. For example, "A" or "B" are risk categories where "A" represents the highest amount of risk. Results will include projects that specifically recorded a rating, all other projects are marked ‘U’ for "Undisclosed."
Borrower
People's Democratic Republic of Algeria, Sarra Bouras
A public entity (government or state-owned) provided with funds or financial support to manage and/or implement a project.
Sectors
  • Transport
The service or industry focus of the investment. A project can have several sectors.
Investment Type(s)
Loan
The categories of the bank investment: loan, grant, guarantee, technical assistance, advisory services, equity and fund.
Investment Amount (USD)
$ 700.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Loan Amount (USD)
$ 700.00 million
Value listed on project documents at time of disclosure. If necessary, this amount is converted to USD ($) on the date of disclosure. Please review updated project documents for more information.
Primary Source

Original disclosure @ AIIB website

Updated in EWS Aug 11, 2026


Contribute Information
Can you contribute information about this project?
Contact the EWS Team

Project Description
If provided by the financial institution, the Early Warning System Team writes a short summary describing the purported development objective of the project and project components. Review the complete project documentation for a detailed description.

According to bank provided information, the project onjective is to improve the competitiveness and sustainability of rail transport along Algeria's Central North-South Corridor, thereby connecting southern production areas with domestic and international markets through Mediterranean ports.

Algeria is transitioning from a hydrocarbon-dependent economy to a diversified, resilient one. The National Land Development Plan (SNAT) 2030 prioritizes unlocking the vast, underdeveloped southern regions, which cover over 80% of the national territory, by investing in sustainable infrastructure that connects resource-rich areas to national and international markets. Despite their potential, these southern wilayas (provinces) remain sparsely populated and economically isolated due to limited transport connectivity.

To address these challenges, Algeria is implementing an ambitious National Railway Development Program to expand the rail network from 7,000 km to 15,000 km by 2035. The Central Corridor Railway, extending roughly 2,500 km from the Port of Algiers on the Mediterranean coast to the border with Niger, is the backbone of this strategy and is designed to unlock trade flows between Western Africa, the Mediterranean, and Asia. Within this larger corridor, the Laghouat-Ghardaia-El Menea Railway Project, represents one of its five strategic sections, covering approximately 495 km of new single-track railway. By closing a critical gap in the southern segment of the corridor, this phase will catalyze regional development, enhance logistics efficiency, and progressively integrate Algeria into continental and intercontinental supply chains as southern regions have significant agricultural, mining, tourism and renewable energy potential. The Algeria Central Corridor Railway Project (the "Project") is planned as a mixed-traffic railway for passenger and freight services and is designed with provision for future electrification and capacity expansion.

The People's Democratic Republic of Algeria (the "Borrower") intends to finance the construction of the Project through the assistance of the African Development Bank (AfDB, the "Lead Financier"), and the Asian Infrastructure Investment Bank (AIIB), along with national funds. The Ministry of Finance of Algeria (the "Borrowing Entity") has requested AIIB's support to finance the Project. AIIB is expected to mobilize its financing through a single loan. This approach would support implementation continuity, provide greater flexibility in fund mobilization and disbursement sequencing, and reduce the risk of mismatches between procurement progress and financing availability.

The Project is expected to comprise the following main components:

  1. Component A:Corresponding to the two major works contracts, Laghouat - Ghardaia and Ghardaia - El Menea.
  2. Component B.1: Associated consulting services, mainly covering the Project Management Consultant (PMC) and two Construction Supervision Consultant (CSC) contracts.
    • Component B.2: AIIB-Proposed Consulting Services (subject to further discussion with the Ministry of Finance (MoF)), potentially covering:
      • Preparation of future critical sections of the Central Corridor;
      • Gap-filling support for existing work packages;
      • Targeted consulting services, where appropriate, to ensure continuity of implementation, enhance coordination across financing tranches, and maintain overall coherence.
  3. Component C: Other project support and institutional activities.

Other Project-related expenses and investments, including land acquisition and utility relocation, rolling stock, taxes, and other non-MDB-eligible expenditures.

Investment Description
Here you can find a list of individual development financial institutions that finance the project.

Contact Information
This section aims to support the local communities and local CSO to get to know which stakeholders are involved in a project with their roles and responsibilities. If available, there may be a complaint office for the respective bank which operates independently to receive and determine violations in policy and practice. Independent Accountability Mechanisms receive and respond to complaints. Most Independent Accountability Mechanisms offer two functions for addressing complaints: dispute resolution and compliance review.

BORROWER

People’s Democratic Republic of Algeria

Sarra Bouras

Head of the Office for AIIB, EBRD, and EIB Affairs

sarra.bouras@mf.gov.dz 

IMPLEMENTING ENTITY

National Agency for Studies and Monitoring of the Implementation of Railway Investments (ANESRIF)

Azeddine Barar

Director of Railway Electrification

barar.azeddine@anesrif.dz 

ACCESS TO INFORMATION

You can submit an information request for project information at: https://www.aiib.org/en/contact/information-request/index.html 

ACCOUNTABILITY MECHANISM OF AIIB

The AIIB has established the Accountability Mechanism for Project-Affected People (PPM). The PPM provides Òan opportunity for an independent and impartial review of submissions from Project-affected people who believe they have been or are likely to be adversely affected by AIIBÕs failure to implement the ESP in situations when their concerns cannot be addressed satisfactorily through Project level GRMs or AIIB Management processes.Ó Two or more project-affected people can file a complaint. Under the current AIIB policy, when the bank co-finances a project with another development bank, it may apply the other bank's standards. You can refer to the Project Summary Information document to find out which standards apply. You can learn more about the PPM and how to file a complaint at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/how-we-assist-you/index.html 

The complaint submission form can be accessed in Arabic, Bahasa Indonesia, Bengali, Chinese, English, Tagalog, Hindi, Nepali, Russian, Turkish, or Urdu. The submission form can be found at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/submission/index.html 

How it works

How it works