According to bank provided information, the Project aims to strengthen Dubai's wastewater management system through the development of a resilient, efficient and sustainable gravity-driven sewerage tunnel network.
The Dubai Strategic Sewerage Tunnel ("DSST") Program comprises the development of a strategic deep-tunnel wastewater conveyance network intended to replace a large portion of the emirate's existing pump-station-based conveyance infrastructure. Specifically, the Project proposes to finance Package J of the overall DSST Program, which includes approximately 60 km of tunnels and associated shafts, the terminal pump station with a capacity of 5,500 million liters per day (MLD), and link sewers and shafts extending across approximately 13 km. The Project is designed to provide long-term wastewater conveyance capacity required to support Dubai's projected population growth, economic expansion and urban development. The Project is expected to improve service reliability, reduce environmental and public health risks, increase operational efficiency and contribute to the emirate's climate resilience, sustainability and resource-efficiency objectives. Through the replacement of energy-intensive pumped conveyance infrastructure with a gravity-driven system, the Project is also expected to generate energy savings and greenhouse-gas emission reductions.
The Project is being delivered under a 30-year Build-Own-Operate-Transfer ("BOOT") concession, with Dubai Municipality acting as contracting authority and offtaker supported by Government of Dubai. A special purpose vehicle ("SPV") will be established and will act as the Borrower. Engineering, procurement and construction ("EPC") obligations will be undertaken by a joint venture under a fixed-price, lump-sum turnkey contract, while operations and maintenance will be undertaken by a dedicated O&M joint venture.
BORROWER
Project Company (SPV) to be established for DSST Package J
dsst_aiib_disclosure@visioninvest.com
PROJECT TEAM LEADER
Asian Infrastructure Investment Bank
Amit Kumar
Principal Investment Officer
Danurachman Krishana
Investment Officer
ACCESS TO INFORMATION
You can submit an information request for project information at: https://www.aiib.org/en/contact/information-request/index.html
ACCOUNTABILITY MECHANISM OF AIIB
The AIIB has established the Accountability Mechanism for Project-Affected People (PPM). The PPM provides Òan opportunity for an independent and impartial review of submissions from Project-affected people who believe they have been or are likely to be adversely affected by AIIBÕs failure to implement the ESP in situations when their concerns cannot be addressed satisfactorily through Project level GRMs or AIIB Management processes.Ó Two or more project-affected people can file a complaint. Under the current AIIB policy, when the bank co-finances a project with another development bank, it may apply the other bank's standards. You can refer to the Project Summary Information document to find out which standards apply. You can learn more about the PPM and how to file a complaint at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/how-we-assist-you/index.html
The complaint submission form can be accessed in Arabic, Bahasa Indonesia, Bengali, Chinese, English, Tagalog, Hindi, Nepali, Russian, Turkish, or Urdu. The submission form can be found at: https://www.aiib.org/en/about-aiib/who-we-are/project-affected-peoples-mechanism/submission/index.html